Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington mhp ![]() Permit status: Issued | Permit id: 13-04796 | |||||
SCORE 100 Wellington mhp Client: Wellington Mhp | Permit type: Res: mfg. Home | Permit status: Expired | Current use: Residential | Permit id: 13-01625 | Parcel: 24704 | |||||
SCORE 95 Wellington mhp Client: Wellington Mhp | Permit type: Res: mfg. Home | Permit status: Expired | Current use: Residential | Permit id: 13-01625 | Parcel: 24704 | |||||
SCORE 100 Wellington mhp Client: Wellington Mhp | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 13-04796 | Parcel: 24704 | |||||
SCORE 99 Wellington mhp Client: Wellington Mhp | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 13-04796 | Parcel: 24704 | |||||
August 5, 2013 2:45:24 pm ssalyer. Placement of new 2008 lot model mobile home with heat pump at wellington mobile home park;sls ref 12-5279 for master site permit; october 1, 2013 10:23: am mlipe. Premise number redacted phone number2; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommended that water l Permit type: Res: mfg. Home | Permit status: Closed | Permit id: 13-04796 | Parcel: 24704 | |||||
March 20, 2013 11:05: am ssalyer. Placement of used mh in wellington mhp;ref 12-5279 for master site permit created co hold need to make sure tcc is issued before release co;owner of property is harry thomas has given a 99 year lease to george morosani for the property use;see documents for agreement between morosani and owner;the permits that ref master site are in the front of the park and will need to ref master approval;the lots in the back are existing;sls turn into wellington estates off iarport rd on wellington dr take first left 8th house on left; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all e Permit type: Res: mfg. Home | Permit status: Expired | Permit id: 13-01625 | Parcel: 24704 | |||||
Wellington mhp ![]() ![]() Permit type: Residential | Permit status: Issued | Permit id: 13-04796 | |||||
Wellington mhp ![]() ![]() Permit type: Residential | Permit status: Issued | Permit id: 13-01625 | |||||
August 5, 2013 2:45:24 pm ssalyer. Placement of new 2008 lot model mobile home with heat pump at wellington mobile home park;sls ref 12-5279 for master site permit; october 1, 2013 10:23: am mlipe. Premise number redacted phone number2; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommended that water l ![]() Permit type: Res: mfg. Home | Permit status: Closed | Permit id: 13-04796 | Parcel: 24704 | |||||
March 20, 2013 11:05: am ssalyer. Placement of used mh in wellington mhp;ref 12-5279 for master site permit created co hold need to make sure tcc is issued before release co;owner of property is harry thomas has given a 99 year lease to george morosani for the property use;see documents for agreement between morosani and owner;the permits that ref master site are in the front of the park and will need to ref master approval;the lots in the back are existing;sls turn into wellington estates off iarport rd on wellington dr take first left 8th house on left; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all e ![]() Permit type: Res: mfg. Home | Permit status: Expired | Permit id: 13-01625 | Parcel: 24704 |