ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Suppression permit Date: May 20, 2015Client: Mlv Freedom Investments L | Permit status: Completed | Permit id: 604533 | |||||
Plumbing permit Date: May 6, 2015Client: Mlv Freedom Investments L | Permit status: Completed | Permit id: 608043 | |||||
Zoning/use permit Date: November 6, 2014Client: Mlv Freedom Investments L | Permit status: Expired | Permit id: 567115 | |||||
Mechanical permit Date: March 25, 2015Client: Mlv Freedom Investments L | Permit status: Completed | Permit id: 598376 | |||||
Electrical permit Date: April 9, 2015Client: Mlv Freedom Investments L | Permit status: Expired | Permit id: 601819 | |||||
Demolition permit Date: November 5, 2014Client: Mlv Freedom Investments L | Permit status: Completed | Permit id: 571206 | |||||
New construction permit Date: March 3, 2015Client: Mlv Freedom Investments L | Permit status: Completed | Permit id: 581964 | |||||
Plumbing permit Date: April 28, 2015Client: Mlv Freedom Investments L | Permit status: Completed | Permit id: 606017 | |||||
Zoning use permit Date: November 6, 2014Client: Mlv Freedom Investments L | Permit status: Expired | Permit id: 567115 | |||||
Demolition permit Date: November 5, 2014Client: Mlv Freedom Investments L | Permit status: Completed | Permit id: 571206 | |||||
New construction permit Date: March 3, 2015Client: Mlv Freedom Investments L | Permit status: Completed | Permit id: 581964 | |||||
Electrical permit Date: April 9, 2015Client: Mlv Freedom Investments L | Permit status: Expired | Permit id: 601819 | |||||
Suppression permit Date: May 20, 2015Client: Mlv Freedom Investments L | Permit status: Completed | Permit id: 604533 | |||||
Mechanical permit Date: March 25, 2015Client: Mlv Freedom Investments L | Permit status: Completed | Permit id: 598376 | |||||
For the complete demolition of existing structures and for the erection of an attached structure with pilot house and roof deck. Size and location as shown in plans. For use as a single-family dwelling. Date: November 6, 2014Client: Mlv Freedom Investments L | Permit type: Zoning/use permit | Permit status: Expired | Completion date: November 6, 2014 | Permit id: 567115 | |||||
SCORE 100 Install one complete hvac system 90k btu furnace 90% 3 1 2 ton a c,all new duct work Date: March 25, 2015 Contractor: Ss Mechanicals HvacClient: Mlv Freedom Investments L | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 31, 2015 | Permit id: 598376 | |||||
SCORE 100 Install a new lateral,curb trap,fai and water service pa20151203218 (sfd)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: May 6, 2015 Contractor: Drain Masters Plumbing LlcClient: Mlv Freedom Investments L | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 31, 2015 | Permit id: 608043 | |||||
SCORE 89 Install 200amp service & wiring throughout, switches, receptacles as per nec 2008 and the 2009 irc - south district Date: April 9, 2015 Contractor: Green Team Electric IncClient: Mlv Freedom Investments L | Permit type: Electrical permit | Permit status: Expired | Completion date: April 9, 2015 | Permit id: 601819 | |||||
SCORE 100 Installation of residential fire suppression system in accordance with nfpa 13-d throughout a three (3) story attached structure with basement and pilot house for roof deck access. This is a multi-purpose system utilizing a combined one inch (1") domestic and fire service line. Separate permit required for all plumbing work. Date: May 20, 2015 Contractor: Oneida Fire ProtectionClient: Mlv Freedom Investments L | Permit type: Suppression permit | Permit status: Completed | Completion date: July 30, 2015 | Permit id: 604533 | |||||
SCORE 93 For the complete demolition of an existing structure. Pedestrian protection to be provided in accordance with b-3306. Sidewalk closure permit to be obtained prior to work commencement. Date: November 5, 2014 Contractor: Ricco ConstructionClient: Mlv Freedom Investments L | Permit type: Demolition permit | Permit status: Completed | Completion date: May 12, 2015 | Permit id: 571206 | |||||
For the installation of underpinning at adjacent structure, and for the erection of an attached, light-framed three (3) story structure with an access pilot house and roof deck. Separate permits to required for the installation electrical, plumbing, and fire suppression system. Date: March 3, 2015Client: Mlv Freedom Investments L | Permit type: New construction permit | Permit status: Completed | Completion date: July 31, 2015 | Permit id: 581964 | |||||
SCORE 100 Install all sanitary drains and water supply to all fixtures 3wc,3 lavs,1 tub,2 showers,1 kitchen sink,1 wm and hwh. The installation will comply with the philadelphia plumbing code 2004 Date: April 28, 2015 Contractor: Drain Masters Plumbing LlcClient: Mlv Freedom Investments L | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 31, 2015 | Permit id: 606017 |