ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Alteration permit Date: October 6, 2011Client: Scoop, Llc | Permit status: Completed | Permit id: 354753 | |||||
Electrical permit Date: April 10, 2012Client: Scoop, Llc | Permit status: Completed | Permit id: 398119 | |||||
Zoning/use permit Date: July 15, 2010Client: Scoop, Llc | Permit status: Completed | Permit id: 291229 | |||||
Plumbing permit Date: December 9, 2011Client: Scoop, Llc | Permit status: Completed | Permit id: 372954 | |||||
Suppression permit Date: December 8, 2011Client: Scoop, Llc | Permit status: Completed | Permit id: 373081 | |||||
Suppression permit Date: September 26, 2014Client: Scoop, Llc | Permit status: Completed | Permit id: 564400 | |||||
Plumbing permit Date: May 1, 2014Client: Scoop, Llc | Permit status: Completed | Permit id: 534012 | |||||
Use permit Date: April 30, 2014Client: Scoop, Llc | Permit status: Completed | Permit id: 482280 | |||||
Electrical permit Date: September 15, 2014Client: Scoop, Llc | Permit status: Completed | Permit id: 559835 | |||||
Mechanical permit Date: March 19, 2012Client: Scoop, Llc | Permit status: Completed | Permit id: 386950 | |||||
Alteration permit Date: May 19, 2014Client: Scoop, Llc | Permit status: Completed | Permit id: 533697 | |||||
Zoning/use permit Date: July 25, 2011Client: Scoop, Llc | Permit status: Completed | Permit id: 337234 | |||||
Mechanical permit Date: October 9, 2014Client: Scoop, Llc | Permit status: Completed | Permit id: 549154 | |||||
Alteration permit Date: July 15, 2010Client: Scoop, Llc | Permit status: Completed | Permit id: 291226 | |||||
Permit for the partial demolition of the 2nd, 3rd and 4th floors to create an inner court yard (16 wide) with the creation of an open walkway bridge at the 3rd floor level and a 4th floor balcony (w/ 42" high railing) and for the partial demolition of the 3rd and 4th floors to create a second inner court yard (12 wide); for the erection of a 5th floor pilot house addition to access the new roof deck (above the 4th floor roof) w/ 42" high railing, as part of an existing attached building for use as an existing retail camera shop with a new entrance lobby area on the first floor, six (6) new family dwellings on the upper floors and utilities/accessory storage (nte 25% gfa) in the cellar. Date: May 11, 2011Client: Scoop, Llc | Applicant: Richard B. Pressman, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: July 11, 2011 | Permit id: 15107 | |||||
Special exception for sit down restaurant on 1st floor with existing six (6) apartments as previously approved in an existing structure. Date: August 14, 2013Client: Scoop, Llc | Applicant: Richard B. Pressman, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: October 17, 2013 | Permit id: 21091 | |||||
Mechanical permit Date: March 19, 2012Client: Scoop, Llc | Permit status: Completed | Permit id: 386950 | |||||
Electrical permit Date: October 9, 2014Client: Scoop, Llc | Permit status: Expired | Permit id: 567070 | |||||
Use permit Date: April 30, 2014Client: Scoop, Llc | Permit status: Completed | Permit id: 482280 | |||||
Suppression permit Date: December 8, 2011Client: Scoop, Llc | Permit status: Completed | Permit id: 373081 | |||||
Plumbing permit Date: May 1, 2014Client: Scoop, Llc | Permit status: Completed | Permit id: 534012 | |||||
Alteration permit Date: May 19, 2014Client: Scoop, Llc | Permit status: Completed | Permit id: 533697 | |||||
Plumbing permit Date: December 9, 2011Client: Scoop, Llc | Permit status: Completed | Permit id: 372954 | |||||
Mechanical permit Date: September 10, 2014Client: Scoop, Llc | Permit status: Completed | Permit id: 559001 | |||||
Alteration permit Date: July 15, 2010Client: Scoop, Llc | Permit status: Completed | Permit id: 291226 | |||||
Zoning use permit Date: July 25, 2011Client: Scoop, Llc | Permit status: Completed | Permit id: 337234 | |||||
Electrical permit Date: November 5, 2012Client: Scoop, Llc | Permit status: Completed | Permit id: 392566 | |||||
Zoning use permit Date: July 15, 2010Client: Scoop, Llc | Permit status: Completed | Permit id: 291229 | |||||
Suppression permit Date: September 26, 2014Client: Scoop, Llc | Permit status: Completed | Permit id: 564400 | |||||
Alteration permit Date: October 6, 2011Client: Scoop, Llc | Permit status: Completed | Permit id: 354753 | |||||
Special exception for sit down restaurant on 1st floor with existing six (6) apartments as previously approved in an existing structure. Date: August 14, 2013Client: Scoop, Llc | Applicant: Richard B. Pressman, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: October 17, 2013 | Permit id: 21091 | |||||
Permit for the partial demolition of the 2nd, 3rd and 4th floors to create an inner court yard (16 wide) with the creation of an open walkway bridge at the 3rd floor level and a 4th floor balcony (w 42" high railing) and for the partial demolition of the 3rd and 4th floors to create a second inner court yard (12 wide); for the erection of a 5th floor pilot house addition to access the new roof deck (above the 4th floor roof) w 42" high railing, as part of an existing attached building for use as an existing retail camera shop with a new entrance lobby area on the first floor, six (6) new family dwellings on the upper floors and utilities accessory storage (nte 25% gfa) in the cellar. Date: May 11, 2011Client: Scoop, Llc | Applicant: Richard B. Pressman, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: July 11, 2011 | Permit id: 15107 | |||||
For the renovation of an existing building 2nd through 4th floors to create six (6) residential units. No work to the first floor commercial space. This activity is a level iii alterations with a partial change in occupancy; a certificate of occupancy will be issued upon completion. All work shall comply with the approved plans. This work activity shall be performed by a contractor licensed by the city of philadelphia. Date: October 6, 2011Client: Scoop, Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: July 3, 2013 | Permit id: 354753 | |||||
SCORE 100 Connect to existing line in basement install new water service, future commercial bldg Date: December 9, 2011 Contractor: B. M. Consulting Services IncClient: Scoop, Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 22, 2013 | Permit id: 372954 | |||||
SCORE 100 New backflow, new fire pump and sprinklers thru out Date: December 8, 2011 Contractor: B. M. Consulting Services IncClient: Scoop, Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: August 10, 2013 | Permit id: 373081 | |||||
SCORE 100 Installation of hvac system including 6 heat pump systems, piping, registers, accessory mechanicals for apartment units. No penetration of enclosed fire rated stairs permitted. Date: March 19, 2012 Contractor: Fresh Air Services IncClient: Scoop, Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 10, 2013 | Permit id: 386950 | |||||
Entry to all shaftways are to be sealed and 2nd and 3rd floor. All floor ceiling assembly must be rated for 2 hr fire seperation. Shaft is a mechanical chase. Date: July 15, 2010Client: Scoop, Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: January 13, 2015 | Permit id: 291226 | |||||
SCORE 100 Fresh air inlet (mixed use) pa20141201683 Date: May 1, 2014 Contractor: Edward Hughes And Sons IncClient: Scoop, Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 534012 | |||||
SCORE 100 Installation of four (4) ul 7 listed commercial kitchen exhaust hoods at first floor kitchen area with associated makeup air and exhaust fans, makeup air duct and grease duct at exterior per engineers plans. Separate permits required for hood fire suppression systems, any electrical plumbing work and all other mechanical work throughout. Date: October 9, 2014 Contractor: Active Contracting LlcClient: Scoop, Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 18, 2014 | Permit id: 549154 | |||||
SCORE 100 4 toilets,4 lav sinks,1 hand wash sink,1 prep sink,(1)3 compartment sink,1 grease trap,2 bar sink (mixed use) Date: September 11, 2014 Contractor: Richards BarrymoreClient: Scoop, Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 18, 2014 | Permit id: 553575 | |||||
For a partial change of occupancy classification to create a one (1) story restaurant space w. Basement storage within an exist. Four (4) story above grade plane, w. Basement & rooftop access structures, multi-family building & for level ii alterations to include erection of partitions for toilet room, storage, & seating areas, cfms set-out construction at exist. Ext. Walls, & installation of new stairway; work area & building is fully sprinklered. Separate permit required for mechanical, electrical, plumbing, & fire suppression work. Date: May 19, 2014Client: Scoop, Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: November 18, 2014 | Permit id: 533697 | |||||
SCORE 100 Relocate existing sprinkler heads(commercial) Date: July 18, 2014 Contractor: Oneida Fire ProtectionClient: Scoop, Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: November 13, 2014 | Permit id: 550321 | |||||
SCORE 100 Wire restaurant lights,receptacles and equipment per 2008 nec (restaurant) Date: September 15, 2014 Contractor: Jonathan Waring Electric LlcClient: Scoop, Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: December 12, 2014 | Permit id: 559835 | |||||
SCORE 93 For the installation of hvac system for the first floor including two (2) air handling units and two (2) duct heaters with piping, registers and associated ductwork as per approved plans. Date: September 10, 2014 Contractor: Igs Services LlcClient: Scoop, Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 13, 2014 | Permit id: 559001 | |||||
For a sit down restaurant on 1st floor with existing six (6) apartments above as previously approved in an existing structure. No sign on this permit. Date: April 30, 2014Client: Scoop, Llc | Permit type: Use permit | Permit status: Completed | Completion date: May 5, 2014 | Permit id: 482280 | |||||
SCORE 100 Install power, switching, lighting, phone, catv & fire alarm as per plans. Date: November 5, 2012 Contractor: Bruce Dagostino JrClient: Scoop, Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: August 16, 2013 | Permit id: 392566 | |||||
SCORE 72 Masonry repairs to fractured portion of exterior wall and replacement of damaged structure. Date: November 30, 2017 Contractor: Mcdevitt Construct And Design InClient: Scoop, Llc | Permit type: Alteration permit | Permit status: Active | Completion date: November 30, 2017 | Permit id: 835918 | |||||
SCORE 96 To install fire suppression system and standard Date: September 26, 2014 Contractor: Dales Fire ExtinguisherClient: Scoop, Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: December 2, 2014 | Permit id: 564400 | |||||
SCORE 100 Relocate pull station and some other devices per 2008 nec & nfpa 72(mixed use) Date: October 9, 2014 Contractor: Jonathan Waring Electric LlcClient: Scoop, Llc | Permit type: Electrical permit | Permit status: Expired | Completion date: October 9, 2014 | Permit id: 567070 | |||||
SCORE 59 Make safe permit - for (cutting off 6x6 foot portion of the brick and reconstruction as directed in submitted engineer report) to resolve case 582450. Abutting sidewalk must be closed with fencing a minimum of 6? In height. Separate streets department permit required for sidewalk closure. A separate permit is required for any additional alterations that are not specifically addressed on case 582450.(additional safety measures may be required based on inspectors initial field inspection) Date: September 8, 2017 Contractor: Mira Construction LlcClient: Scoop, Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: October 11, 2017 | Permit id: 814560 | |||||
SCORE 100 Install temporary receptacles for lighting for construction - as per 2008 nec Date: April 10, 2012 Contractor: Bruce Dagostino JrClient: Scoop, Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: August 16, 2012 | Permit id: 398119 | |||||
For the erection of a flat wall sign ( existing sign same size to be removed)). Size and location as shown in the application. Sign accessory to a retail sale of camera on first floor in an existing structure. Date: July 15, 2010Client: Scoop, Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 5, 2014 | Permit id: 291229 | |||||
SCORE 95 For the partial demolition of the 2nd, 3rd, & 4th flrs to create an inner court yard (16 wide) w the creation of an open walkway bridge at the 3rd flr level & a 4th flr balcony (w 42" high railings) and for the partial demolition of the 3rd and 4th flrs to create a second inner court yard (12 wide); for the erection of a 5th flr pilot house addition to access the new roof deck (above the 4th flr roof) w 42" high railings, as part of an existing attached building, (size and location as shown in the application). For use as an existing retail camera shop w a new entrance lobby area on the first floor, six (6) new family dwellings on the upper floors and utilities acc. Storage (nte 25% gfa) in the cellar. Date: July 25, 2011 Contractor: Atrium LlcClient: Scoop, Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 5, 2014 | Permit id: 337234 |