Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning use permit Date: January 11, 2017 Client: Murray Gary | Permit status: Completed | Permit id: 727999 | |||||
Permit for the erection of an attached 3 story structure to include a roof deck accessed by a rooftop structure and an accessory off street parking, for use as two family household living (size and location as shown in the application) Date: October 21, 2016 Client: Murray Gary | Applicant: Joseph Beller, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: January 23, 2017 | Permit id: 29092 | |||||
SCORE 100 Install 200amp main service, 2 panels, 2 gang meter and grounding no common space , all wiring throughout recepts,switches,lights,smokes co detector,phone & cable tv wiring as per 2008 nec (east district) Date: August 23, 2017 Contractor: Baldwin Electrical Const Llc Client: Mazal Tov Development Llc | Permit type: Electrical permit | Permit status: Active | Completion date: August 23, 2017 | Permit id: 810609 | |||||
Application for the erection of an attached three story, two family structure with basement, pilot house access roof deck, for a one car off street parking stall with new curbcut and fence at rear yard. Date: January 11, 2017 Client: Mazal Tov Development Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: January 11, 2017 | Permit id: 727999 | |||||
SCORE 100 Install two (2) new fire suppression systems (one for each dwelling unit) with two (2) 1" combined services in accordance with nfpa 13d throughout the entire building (two family dwelling). All work shall comply with the approved plans. All work shall be performed by a fire suppression contractor licensed by the city of philadelphia. Date: September 6, 2017 Contractor: B. M. Consulting Services Inc Client: Mazal Tov Development Llc | Permit type: Suppression permit | Permit status: Active | Completion date: September 20, 2017 | Permit id: 810302 | |||||
SCORE 93 Install 2 hvac units with ductwork (two-family dwelling) Date: August 9, 2017 Contractor: Igs Services Llc Client: Mazal Tov Development Llc | Permit type: Mechanical permit | Permit status: Active | Completion date: August 31, 2017 | Permit id: 803033 | |||||
SCORE 93 Ez plumbing permit pr the attached standard - new 4" pvc main drain with 3" stacks, 3" pvc for toilets & 1 1 2 " pvc for all small wastes. New pex system for water. Date: June 15, 2017 Contractor: Michael Fugarino Client: Mazal Tov Development Llc | Permit type: Plumbing permit | Permit status: Active | Completion date: September 20, 2017 | Permit id: 792282 | |||||
New construction of a three (3) story attached wood-frame building with pilot house for roof deck access for use as a two (2) family dwelling with one (1) on-site surface parking space. Special inspection reports shall be furnished to department field inspector for underpinning work along south side. Separate permits required for all mechanical, electrical, plumbing and fire suppression work. Date: May 4, 2017 Client: Mazal Tov Development Llc | Permit type: New construction permit | Permit status: Active | Completion date: October 2, 2017 | Permit id: 760729 | |||||
SCORE 93 New curb trap,fai,5"lateral and (2)-1"water service-pa1#20172511511-"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: September 8, 2017 Contractor: Michael Fugarino Client: Mazal Tov Development Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 18, 2017 | Permit id: 814751 |