ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Water heater replacement, no modifications or alternations to existing system Date: February 11, 2015Permit type: Plumbing : 8015 - ac | Permit status: Permit finaled | Completion date: February 18, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 99 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 3, 2014 Contractor: Daniel SullivanPermit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: September 25, 2014 | Permit id: Pds2014-Resalt- | |||||
62 sf reroof (class a comp) from eaglelite for existing sfd your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: April 19, 2011 Value: $9,300Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: August 5, 2011 | Permit id: Pds2011-1030-20 | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 3, 2014Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 25, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 3, 2014 Contractor: Sullivan Solar Power Of California IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: September 25, 2014 | Permit id: Pds2014-Resalt- | |||||
Final Date: February 17, 2015Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Date: September 23, 2014Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
Final Date: April 20, 2011Permit status: Fail | Permit id: Pds2011-1030-20 |