ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Alteration permit Date: April 19, 2016Client: Invest Smart Inc | Permit status: Active | Permit id: 685525 | |||||
Plumbing permit Date: May 4, 2016Client: Invest Smart Inc | Permit status: Active | Permit id: 689259 | |||||
Alteration permit Date: April 19, 2016Client: Invest Smart Inc | Permit status: Completed | Permit id: 685539 | |||||
Plumbing permit Date: May 4, 2016Client: Invest Smart Inc | Permit status: Expired | Permit id: 689259 | |||||
SCORE 82 100amp service and rewire throughout,outlets,switches,smoke co detectors and electirc water heater (sfd)south district Date: May 12, 2017 Contractor: Terox Electric And ConstructionClient: Equity Trust Company Fbo Hangehun Zhang Ira | Permit type: Electrical permit | Permit status: Completed | Completion date: November 1, 2017 | Permit id: 783278 | |||||
SCORE 100 Replace stack,waste and water lines and set fixtures 2 wc,2 lav sink,2 bath tubs and kitchen sink (sfd)the installation will comply with the philadelphia plumbing code 2004 Date: May 4, 2016 Contractor: Norman Cole Sr,Client: Equity Trust Company Fbo Hangehun Zhang Ira | Permit type: Plumbing permit | Permit status: Active | Completion date: June 5, 2017 | Permit id: 689259 | |||||
SCORE 72 For the construction of a two (2) story rear addition with interior alterations and renovation to an existing single family dwelling as per plans, Date: April 5, 2017 Contractor: He General Enterprise IncClient: Equity Trust Company Fbo Hangehun Zhang Ira | Permit type: Addition permit | Permit status: Active | Completion date: June 28, 2017 | Permit id: 761805 | |||||
SCORE 86 Interior demo and interior alterations to include drywall throughout, moisture resistant drywall in the bathroom and kitchen, new windows and doors in existing opening. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Separate permits required for plumbing, electrical and mechanical work Date: April 19, 2016 Contractor: Vae Construction LlcClient: Equity Trust Company Fbo Hangehun Zhang Ira | Permit type: Alteration permit | Permit status: Active | Completion date: November 13, 2017 | Permit id: 685525 | |||||
SCORE 86 Remove and replace front brick facade. Masonry front wall - remove existing front masonry wall. Replace with new 8 inch masonry wall, (4" brick & 4" block) on existing foundation. Windows and doors to comply with emergency egress standards per irc.. New door opening for 36 inch door. Flash roof to new front. Vertical reinforcement every 24 inches. Install returns into party walls for structural connection. Flash and seal roof. Install 2 x 4 frame wall, r-13 insulation and sheetrock on interior front wall for finish. No other work allowed under this permit. Date: April 19, 2016 Contractor: Vae Construction LlcClient: Equity Trust Company Fbo Hangehun Zhang Ira | Permit type: Alteration permit | Permit status: Completed | Completion date: August 18, 2016 | Permit id: 685539 | |||||
SCORE 99 Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: May 18, 2017 Contractor: D R Builders 35 LlcClient: Equity Trust Company Fbo Hangehun Zhang Ira | Permit type: Mechanical permit | Permit status: Active | Completion date: June 14, 2017 | Permit id: 784881 |