Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing and gas Date: August 19, 2013 Client: Allen L Lawrence | Applicant: David F. Brown | Permit status: Permit issued | Permit id: P1307116 | |||||
Plumbing and gas Date: April 22, 2014 Client: Melissa Chen | Applicant: Louis Corrado Copeland | Permit status: Completed | Permit id: P1404984 | |||||
Replacement in kind of interior wall coverings. Replacement in kind, when applied to architectural features, means replacement with a feature of like material that replicates the existing feature in proportion, appearance, texture, design, detail and dimensions. Date: October 26, 2012 Applicant: Jonathan Boocock | Permit type: Building | Permit status: Permit issued | Permit id: Pc97015793 | |||||
Level 1 alteration to include removal and replacement of the existing fire alarm panel and associated field devices with a new fire lite alarm panel and field devices. Existing strobes and audible devices will be reused in their existing locations. Existing conduit and wiring will be reused. Power for the new fire alarm control panel shall be provided from the existing 120vac connection. Date: January 25, 2012 Client: Hightowers, Llc | Applicant: Hightowers, Llc; Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1202293 | |||||
Converting existing space into three additional dwelling units. Date: December 27, 2012 Client: John Theoharis | Applicant: Elise Shinagawa | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1212844 | |||||
The purpose of this application is to revise the previously pulled antenna permit # an1200024. Sprint proposes to install a fiber optic run from the fiber box in the telco room to the wireless facility on the roof. Date: June 21, 2012 Client: Hightower Apartments Lp Co Peabody Corp | Applicant: Hightower Apart C/o Peabody Corp; William Stone | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: An1200226 | |||||
Remove existing 3 panel antennas / install 6 new panel antennas install 1 new equipment cabinet Date: January 26, 2012 Client: Hightowers Llc | Applicant: Hightowers Llc; Tim Aco Property Advisors | Permit type: Miscellaneous | Permit status: Completed | Permit id: An1200024 | |||||
Electrical Date: January 30, 2012 Client: Hightower Apartments Lp | Applicant: Wayne O Reep | Permit status: Completed | Permit id: E1203059 | |||||
Plumbing and gas Date: March 12, 2013 Client: Hightower Apartments Lp | Applicant: Donald E. Decarr | Permit status: Completed | Permit id: P1303418 | |||||
This building permit is to revise the existing building permit number b1212844, which should reflect the total number of purposed dwelling units as per the dcra approved plans as 86. The correct total number of dwelling units is 89, three of which were converted at basement level. Date: February 10, 2014 Client: Hightowns Llc | Applicant: Amanda Barley | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1404148 | |||||
Install 20. 5kw pv system -82panels x 250w- on the roof. Date: November 6, 2015 Client: Foundry Church Foundry Church | Applicant: Armen Mkhoyan - Greenbrilliance | Permit type: Addition | Permit status: Permit issued | Permit id: B1513120 | |||||
SCORE 92 Plumbing and gas Date: August 19, 2013 Contractor: David F. Brown Client: Allen L Lawrence | Permit status: Permit issued | Permit id: P1307116 | |||||
SCORE 92 Plumbing and gas Date: August 19, 2013 Contractor: David F. Brown Client: Allen L Lawrence | Permit status: Permit issued | Permit id: P1307116 | |||||
SCORE 92 Plumbing and gas Date: August 19, 2013 Contractor: David F. Brown Client: Allen L Lawrence | Permit status: Permit issued | Permit id: P1307116 | |||||
SCORE 96 Plumbing and gas Date: April 22, 2014 Contractor: Louis Corrado Copeland Client: Melissa Chen | Permit status: Completed | Permit id: P1404984 | |||||
SCORE 96 Plumbing and gas Date: April 22, 2014 Contractor: Louis Corrado Copeland Client: Melissa Chen | Permit status: Completed | Permit id: P1404984 | |||||
SCORE 96 Plumbing and gas Date: April 22, 2014 Contractor: Louis Corrado Copeland Client: Melissa Chen | Permit status: Completed | Permit id: P1404984 | |||||
SCORE 96 Plumbing and gas Date: April 22, 2014 Contractor: Louis Corrado Copeland Client: Melissa Chen | Permit status: Completed | Permit id: P1404984 |