ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 86 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 17, 2013 Contractor: Brad TuckerPermit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: November 5, 2013 | Permit id: Pds2013-Resalt- | |||||
55 sq ft re felt (removing tile and just replacing felt and putting same tile back) due to water damage. Your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: January 24, 2011 Value: $25,300Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: January 28, 2011 | Permit id: Pds2011-1030-20 | |||||
Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 17, 2013Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 5, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 17, 2013 Contractor: Sullivan Solar Power Of California IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: November 5, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 99 55 sq ft re felt (removing tile and just replacing felt and putting same tile back) due to water damage. Your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 28, 2011 | Permit id: Pds2011-1030-20 | |||||
Final Date: October 31, 2013Permit status: Pass | Permit id: Pds2013-Resalt- | |||||
Final Date: January 26, 2011Permit status: Pass | Permit id: Pds2011-1030-20 |