ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 Service change to 1 amps. Date: June 21, 2006 Contractor: Candlelight ElectricClient: Amy Belk | Applicant: Candlelight Electric | Permit type: Electrical | Permit status: Cmp | Completion date: August 18, 2006 | Current use: Multifamily dwe | |||||
SCORE 95 Installation of a flush mount 2. 695 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. No structural modifications approved. Date: January 7, 2014 Contractor: Solarcity CorporationClient: Michael Simpson,Carol Simpson | Applicant: Solarcity Corporation | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 30, 2014 | Current use: Townhomes, exis | |||||
SCORE 95 Installation of a flush mount 2. 695 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. No structural modifications approved. Client: Michael Simpson | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 30, 2014 | Current use: Townhomes, existing | Permit id: Pmt2014-00083 | |||||
SCORE 95 Service change to 1 amps. Client: Amy Belk | Permit type: Electrical | Permit status: Cmp | Completion date: August 18, 2006 | Current use: Multifamily dwellings, existing | Permit id: Pmt2006-02454 | |||||
SCORE 95 Electrical service upgrade, 1 amp. Date: September 7, 2017 Contractor: Save Home Heat Co, IncClient: Michael Simpson | Permit type: Electrical | Permit status: Cmp | Completion date: October 20, 2017 | Current use: Multifamily dwellings, existing | Permit id: Pmt2017-03825 |