SCORE 59 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: June 28, 2016 Contractor: Gary Lake Air ConditioningPermit type: Residential alteration-addn | Permit status: Completed | Completion date: July 18, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 68 Roof mount residential solar pv with 225amp msp upgrade for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 15, 2016 Contractor: Keegan ElectricPermit type: Residential alteration-addn | Permit status: Completed | Completion date: April 19, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: July 13, 2016Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
SCORE 59 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: June 28, 2016 Contractor: Gary Lake Air ConditioningPermit type: Mechanical - hvac change out | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 68 Roof mount residential solar pv with 225amp msp upgrade for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 15, 2016 Contractor: Keegan ElectricPermit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2016-Resalt- | Parcel: 2214112100 |