Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Existing residential main electrical service upgrade - 125a- the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. 9 27 16 plan change -- upgrade changed from 2 to 125 amps service... Vmt Date: September 7, 2016 Contractor: Myers Electric Co Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 2, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 89 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 9 22 16 plan change -- changed msp from 2 to 125 amps; see c of a... Vmt Date: September 7, 2016 Contractor: Hosopo Corporation Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 2, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: November 29, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
SCORE 89 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 9 22 16 plan change -- changed msp from 2 to 125 amps; see c of a... Vmt Date: September 7, 2016 Contractor: Hosopo Corporation Permit type: Res roof mt solar pv | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 98 Existing residential main electrical service upgrade - 125a- the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. 9 27 16 plan change -- upgrade changed from 2 to 125 amps service... Vmt Date: September 7, 2016 Contractor: Myers Electric Co Permit type: Electrical - existing main svc upgrade (max 400a) | Permit status: Issued | Permit id: Pds2016-Resalt- |