Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: November 16, 2011 Client: Chan Phillip | Permit status: Completed | Permit id: 374268 | |||||
Electrical permit Date: September 1, 2011 Client: Chan Phillip | Permit status: Completed | Permit id: 361303 | |||||
Electrical permit Date: September 1, 2011 Client: Chan Phillip | Permit status: Completed | Permit id: 361303 | |||||
Alteration permit Date: November 16, 2011 Client: Chan Phillip | Permit status: Completed | Permit id: 374268 | |||||
SCORE 100 2 amp 1 phase service as per 2008 nec (east dist) Date: September 1, 2011 Contractor: A1 Electric Client: Chan Phillip | Permit type: Electrical permit | Permit status: Completed | Completion date: October 31, 2011 | Permit id: 361303 | |||||
SCORE 56 Correct violations : repair floor and ceiling,replace (1) ceiling joist,patch roof sheathing and apply new roof covering. Cracks in the outside walls, remove tree growning out of west wall, remove all loose and damaged masonry and replace with new masonry to match original. Windows and doors repairs, front entrance steps and remove water in elevator shaft opening Date: November 16, 2011 Contractor: Groff Industries Llc Client: Chan Phillip | Permit type: Alteration permit | Permit status: Completed | Completion date: January 13, 2015 | Permit id: 374268 | |||||
SCORE 100 Existing 400a service replace 400a service disconnect switch and meter sockets Date: September 28, 2017 Contractor: Deng Bing Client: Chan Phillip | Permit type: Electrical permit | Permit status: Active | Completion date: September 28, 2017 | Permit id: 811119 |