ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
New construction permit Date: August 26, 2016Client: Us Capital Investment 2 L | Permit status: Active | Permit id: 712915 | |||||
Zoning/use permit Date: June 29, 2016Client: Us Capital Investment 2 L | Permit status: Completed | Permit id: 702625 | |||||
Zoning use permit Date: June 29, 2016Client: Us Capital Investment 2 L | Permit status: Completed | Permit id: 702625 | |||||
New construction permit Date: August 26, 2016Client: Us Capital Investment 2 L | Permit status: Active | Permit id: 712915 | |||||
Suppression permit Date: October 25, 2016Client: Us Capital Investment 2 L | Permit status: Active | Permit id: 729708 | |||||
Electrical permit Date: October 31, 2016Client: Us Capital Investment 2 L | Permit status: Active | Permit id: 724438 | |||||
Plumbing permit Date: December 21, 2016Client: Us Capital Investment 2 L | Permit status: Active | Permit id: 744146 | |||||
SCORE 86 300a incoming service, wiring of switches receptacles and hard wired smoke detectors by 2008 per nec 2008 (triplex))(east district)install fire alarm per nfpa 72 Date: October 31, 2016 Contractor: Sigma Electric Group IncClient: Topsale Haynes | Permit type: Electrical permit | Permit status: Completed | Completion date: May 25, 2017 | Permit id: 724438 | |||||
For the erection of a three (3) story three (3) family dwelling with roof decks. Building shall be fully sprinklered. Separate permits required for mechanical, electrical, plumbing, and fire suppression systems. Date: August 26, 2016Client: Topsale Haynes | Permit type: New construction permit | Permit status: Completed | Completion date: May 25, 2017 | Permit id: 712915 | |||||
For the erection of an attached structure ( nte 38 high); pilot house accessed by a roof deck for a multi-family household living ( three(3) dwelling units ) from first floor through third floors. Size and location as shown in the application. Date: June 29, 2016Client: Topsale Haynes | Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 29, 2016 | Permit id: 702625 | |||||
SCORE 89 Install (3) hvac systems with ductwork. (multi-family) Date: February 7, 2017 Contractor: Alkaun CoClient: Topsale Haynes | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 25, 2017 | Permit id: 757285 | |||||
SCORE 100 Install new 1" water distributyion,5" slant and lateral,5" curb trap,fai,main drain and area drain pa20163400348 (triplex) self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: December 21, 2016 Contractor: Excel Plumbing Heating Ac IncClient: Topsale Haynes | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 25, 2017 | Permit id: 744146 | |||||
SCORE 100 New construction: interior plumbing; three (3) story three (3) family dwelling with roof decks - the installation will comply with the philadelphia plumbing code 2004 Date: February 28, 2017 Contractor: Miller Brian SrClient: Topsale Haynes | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 25, 2017 | Permit id: 731199 | |||||
SCORE 100 Installation of sprinkler system to entire building with 2 inch service line and backflow prevention assembly. Sprinkler system in accordance with nfpa 13r. Date: October 25, 2016 Contractor: Shannon Fire ProtectionClient: Topsale Haynes | Permit type: Suppression permit | Permit status: Completed | Completion date: May 25, 2017 | Permit id: 729708 |