ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Operations permit Date: April 16, 2015Permit status: Completed | Permit id: 23432 | |||||
Electrical permit Date: December 28, 2012Permit status: Completed | Permit id: 433649 | |||||
Demolition permit Date: March 27, 2013Permit status: Completed | Permit id: 460446 | |||||
Alteration permit Date: November 7, 2012Permit status: Completed | Permit id: 431653 | |||||
Alteration permit Date: May 20, 2013Permit status: Completed | Permit id: 466169 | |||||
Mechanical permit Date: September 4, 2014Permit status: Completed | Permit id: 558348 | |||||
Alteration permit Date: September 4, 2014Permit status: Completed | Permit id: 558349 | |||||
Alteration permit Date: April 16, 2015Permit status: Completed | Permit id: 603461 | |||||
Demolition permit Date: March 27, 2013Permit status: Completed | Permit id: 460446 | |||||
Operations permit Date: April 16, 2015Permit status: Completed | Permit id: 23432 | |||||
Electrical permit Date: December 28, 2012Permit status: Completed | Permit id: 433649 | |||||
Alteration permit Date: November 7, 2012Permit status: Completed | Permit id: 431653 | |||||
Mechanical permit Date: September 4, 2014Permit status: Completed | Permit id: 558348 | |||||
Alteration permit Date: September 4, 2014Permit status: Completed | Permit id: 558349 | |||||
Alteration permit Date: April 24, 2015Permit status: Completed | Permit id: 593069 | |||||
Alteration permit Date: May 20, 2013Permit status: Completed | Permit id: 466169 | |||||
SCORE 100 Disconnect exisiting 5kv 2 phase service furnish and install 15kv service,800amp 3 phase 120 208v service and install new meter banks per 2008 nec (apt bldg) Date: December 28, 2012 Contractor: Goldsmith Associates IncPermit type: Electrical permit | Permit status: Completed | Completion date: April 11, 2014 | Permit id: 433649 | |||||
SCORE 100 Close in place one, 40 gallon underground storage tank containing #2 heating oil. After interior has been cleaned the tank will be filled with an inert material Date: March 27, 2013 Contractor: J And J Spill Service And SuppliesPermit type: Demolition permit | Permit status: Completed | Completion date: October 11, 2014 | Permit id: 460446 | |||||
Complete removal of exterior fire escape. Installation of new unit by others. Date: April 16, 2015Permit type: Alteration permit | Permit status: Completed | Completion date: May 18, 2015 | Permit id: 603461 | |||||
SCORE 99 Interior alterations to include the construction of a reinforced masonry vault room in the basement of an existing structure. Construction limitations in accordance with approved plans. Date: May 20, 2013 Contractor: Alarcon And Marrone Demolition CPermit type: Alteration permit | Permit status: Completed | Completion date: December 24, 2014 | Permit id: 466169 | |||||
SCORE 89 Installation of heat pump units in new locations at interior hallways and exterior through wall openings with new structural lintels and brick repairs, as per plans and specifications. In conjunction with structural alts permit ap558349. No new openings on walls abutting property lines. Any sidewalk shelter platforms or sidewalk protection requires streets approval and additional permit. Comply issued violation. Date: September 4, 2014 Contractor: W Kramer Associates IncPermit type: Mechanical permit | Permit status: Completed | Completion date: February 2, 2015 | Permit id: 558348 | |||||
SCORE 95 Installation of heat pump units in new locations at interior hallways and exterior through wall openings with new structural lintels and brick repairs, as per plans and specifications. In conjunction with mechanical alts permit ap558348. Precode use occupancy. No new openings on walls abutting property lines. Any sidewalk shelter platforms or sidewalk protection requires streets approval and additional permit. Comply issued violation. Date: September 4, 2014 Contractor: Rays Home Repair And Demol IncPermit type: Alteration permit | Permit status: Completed | Completion date: February 3, 2015 | Permit id: 558349 | |||||
SCORE 89 04 16 2015 hotworks permit welding cutting soldering torch work - permit expires 04 16 2016 Date: April 16, 2015 Contractor: Alarcon And Marrone IncorpPermit type: Operations permit | Permit status: Completed | Permit id: 23432 | |||||
SCORE 100 For the installation of (18) solar hotwater preheat panels with connection to (2400) gal. Storage system at roof level of an existing four (4) story apartment building; solar panel installation & structural support through connection to existing roof rafter framing. Date: November 7, 2012 Contractor: Rushforth Solar LlcPermit type: Alteration permit | Permit status: Completed | Completion date: August 10, 2013 | Permit id: 431653 | |||||
SCORE 56 For the replacement of exterior balconies, landings and handrails to an existing building for use as an apartment building. All work to be done per approved plans. If field conditions vary contact structural engineer prior to the start of any work. Separate permits required for all other work. Date: April 24, 2015 Contractor: Peter Reich And Assoc DesignersPermit type: Alteration permit | Permit status: Completed | Completion date: July 2, 2015 | Permit id: 593069 |