SCORE 82 The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: May 16, 2015 Contractor: John AlmondPermit type: Electrical : 8002 - | Permit status: Permit issued | Permit id: Pds2015-Resalt- | |||||
SCORE 86 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: July 26, 2016 Contractor: Bill Howe Heating And Air Conditioning IncPermit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: May 16, 2015Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 15, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: May 16, 2015 Contractor: Semper Solaris Construction IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: September 15, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Date: September 14, 2015Permit status: Pass | Permit id: Pds2015-Resalt- |