Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: June 6, 2014 Contractor: Vivint Solar Developer Llc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2014-Resalt- | Parcel: 105-092-42-00 | |||||
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: February 17, 2016 Contractor: W C Heating And Air Conditioning Inc Permit type: Mechanical - hvac change out | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 59 47 sq ft re roof with firestone mil class a t-24 membrane for existing commerical building address for building is 1408 s. Mission rd your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Commercial alteratio | Permit status: Issued invalid expired | Permit id: Pds2011-1030-20 | Parcel: 104-201-18-00 |