SCORE 86 Revolving door at swedes. Door replacements and associated footing, foundation, and walkway construction. Plan revew #10-0405. Client: Swedish American Hospital | Permit id: Mulcom20101228 | |||||
SCORE 89 Swedish american servery remodel. Remodel the existing servery. Plan review 09-1104. Date: January 25, 2010 Contractor: Nelson Fire Protection Client: Swedish American Hospital | Permit id: Plum20091845 | |||||
SCORE 93 1 wc, 1 lav, 1 fd Client: Ringland Johnson | Permit id: Plum20101504 | |||||
Provide stairs to mechanical equipment from roof to mechanical roof. Date: January 5, 2009 Value: $20,000 Client: Swedish American Hospital, Alise Howlett | Permit id: Mulcom20081222 | |||||
SCORE 93 Relocation adminstration office of swedes on ground level. Selective demolition and remodeling of an existing adjacent waiting space. M,e,p,fp work is included. Plan revew #08-1203 Client: Ringland Johnson | Permit id: Mulcom20081208 | |||||
(electrical) "swedish administration" - 1st floor & basement interior remodeling. Ref. Plan review #08-1203. Relocation adminstration office of swedes on ground level. Selective demolition and remodeling of an existing adjacent waiting space. Date: May 20, 2009 Client: Swedish American Hospital | Permit id: Elect20081114 | |||||
Relocation adminstration office of swedes on ground level. Selective demolition and remodeling of an existing adjacent waiting space. M,e,p,fp work is included. 1 wc, 1 lav, 1 hand sink, 1 fd Date: June 1, 2009 Client: Swedish American Hospital | Permit id: Plum20081104 | |||||
SCORE 93 Plan revew #09-0604. Swedes outpatient surgery waiting buildout. Finishes, new door and frame with sidelight. Drywall, casework, paint, flooring. E & p work is included. Client: Ringland Johnson | Permit id: Mulcom20091370 | |||||
SCORE 89 Swedes outpatient surgery waiting buildout. Add lights and outlets to existing space Date: June 10, 2009 Contractor: Ballard Companies Inc Client: Swedish American Hospital | Permit id: Elect20091395 | |||||
Fire suppression 2478 sq. Ft. 26 heads 08-1203 Date: July 17, 2009 Value: $4,600 Permit id: Plum20091454 | |||||
Relocation adminstration office of swedes on ground level. Selective demolition and remodeling of an existing adjacent waiting space. M,e,p,fp work is included. 2 vav boxes; 1. 5 kw duct heaters; 1 kw ele reheat Date: August 11, 2009 Client: Swedish American Hospital | Permit id: Mech20081335 | |||||
SCORE 93 Ed nurses station - second floor @ swedes. Remove millwork counter and replace; remove walls as shown on drawings. Plan revew #09-1008. Client: Swedish American Hospital | Permit id: Mulcom20091751 | |||||
SCORE 93 Risk management offices @ swedes. Renovation of hospital lab space on the second level. The scope of work will include demolition of walls, flooring, ceiling and fixtures. Then new work. M,e,p,fp work is included. Plan revew #09-0917. Client: Ringland Johnson | Permit id: Mulcom20091708 | |||||
SCORE 96 (electrical) "risk management offices" - office remodel: new lighting & outlets, wiring to existing panels, #5-7-9 & 11. P. O. #91014. Renovate lab 2nd floor. Plan revew #09-0917. Date: October 30, 2009 Contractor: Wilson Electric Co Client: Swedish American Hospital | Permit id: Elect20091819 | |||||
Risk management offices @ swedes. Renovation of hospital lab space on the second level. The scope of work will include demolition of walls, flooring, ceiling and fixtures. Then new work. M,e,p,fp work is included. Plan revew #09-0917. Date: November 12, 2009 Client: Swedish American Hospital | Permit id: Mech20092384 | |||||
Risk management offices @ swedes. Renovation of hospital lab space on the second level. The scope of work will include demolition of walls, flooring, ceiling and fixtures. Then new work. M,e,p,fp work is included. Plan revew #09-0917. Fire suppression. 6 heads. Date: November 23, 2009 Client: Swedish American Hospital | Permit id: Plum20091793 | |||||
SCORE 93 Swedish american servery remodel. Remodel the existing servery. Plan review 09-1104. Client: Swedish American Hospital | Permit id: Mulcom20091822 | |||||
(electrical) "swedish american" - servery remodel. Remodel the existing servery. Expansion 3273 sq ft. Ref. Plan review 09-1104. Date: January 6, 2010 Client: Swedish American Hospital | Permit id: Elect20091858 | |||||
Swedish american servery remodel. (1) ex fan @ 1375 cfm, (1) ex fan @ 28 cfm, (1) ex fan @ 3325 cfm Date: January 21, 2010 Client: Swedish American Hospital | Permit id: Mech20092470 | |||||
SCORE 89 Swedish american servery remodel. Remodel the existing servery. Plan review 09-1104. Date: January 25, 2010 Contractor: Nelson Fire Protection Client: Ringland Johnson | Permit id: Plum20091845 | |||||
(2) hs, (1) ms, (15) fd Date: March 10, 2010 Value: $84,000 Client: Swedish American Hospital | Permit id: Plum20091844 | |||||
1,500,0 btu Date: March 10, 2010 Value: $6,300 Client: Ringland Johnson | Permit id: Mech20092471 | |||||
SCORE 96 (electrical) "ssa - surgical services area". (1) new 225 amp mlo panelboard, relocating existing 225 amp mlo panelboard, new lighting, outlets and switches. Ssa renovation at swedes. Ssa will remain active, with 3 phases of work with full dust and infection control. The project is to relocate the break room, an office and expand existing ante/drop off room. Ref. Plan review #10-0215. P. O. #100322. 6/22/10, this permit is in (3) phases. Phase i is complete. 7/9/10, phase ii has now begun. Date: March 19, 2010 Contractor: Wilson Electric Co Client: Swedish American Hospital | Permit id: Elect20101114 | |||||
Ssa renovation at swedes. Ssa will remain active, with 3 phases of work with full dust and infection control. The project is to relocate the break room, an office and expand existing ante/drop off room. Plan revew #10-0218. Date: April 23, 2010 Value: $239,900 Client: Swedish American Hospital | Permit id: Mulcom20101109 | |||||
(1) ks Date: May 21, 2010 Value: $5,300 Client: Swedish American Hospital | Permit id: Plum20101124 | |||||
SCORE 93 Swedish american heritage center. Demolition and new construction for museum space. Plan review 10-0406. Work includeds hvac on first floor and in basement, electrical work in basement and on first floor, plumbing in basement and first floor, fire protection. Client: Ringland Johnson | Permit id: Mulcom20101229 | |||||
SCORE 93 Convert office area into restroom Client: Ringland Johnson | Permit id: Mulcom20101341 | |||||
1 wc, 1 lav, 1 fd Date: June 8, 2010 Value: $10,000 Client: Swedish American Medical Foundation | Permit id: Plum20101504 | |||||
(3) 4" dual duct vav(2) 6" dual duct vav Date: June 10, 2010 Value: $49,773 Client: Swedish American Hospital | Permit id: Mech20101219 | |||||
7 nozzles, - 2 systems Date: June 15, 2010 Value: $3,100 Client: Ringland Johnson | Permit id: Mech20092472 | |||||
(5) 1 ton ac units, ductwork Date: June 16, 2010 Value: $60,520 Client: Swedish American Hospital | Permit id: Mech20101465 | |||||
SCORE 89 (electrical) "swedish american hospital" - 2nd floor surgery, out-patient waiting area restroom. This is a counter permit - plans are with application. Date: June 24, 2010 Contractor: Ballard Companies Inc Client: Ringland Johnson | Permit id: Elect20101390 | |||||
Ssa renovation at swedes. Ssa will remain active, with 3 phases of work with full dust and infection control. The project is to relocate the break room, an office and expand existing ante/drop off room. Plan revew #10-0218. Date: July 19, 2010 Client: Swedish American Hospital | Permit id: Plum20101665 | |||||
Revolving door at swedes. Door replacements and associated footing, foundation, and walkway construction. Plan revew #10-0405. Date: July 26, 2010 Value: $112,000 Client: Swedish American Hospital | Permit id: Mulcom20101228 | |||||
SCORE 89 (electrical) "heritage ctr, swedish american" - buildout basement & 1st floor: (1) 1 amp feeder, (1) 225 amp feeder. 1st floor buildout: basement feeder only work. Automatic dimming panel. Fire alarm. Plan review 10-046. Date: July 30, 2010 Contractor: Ballard Companies Inc Client: Swedish American Hospital | Permit id: Elect20101253 | |||||
Demolition of nurses dorm #3 Date: August 6, 2010 Value: $306,000 Client: Swedish American Hospital | Permit id: Mulcom20101572 | |||||
SCORE 56 Construct parking lot within area where dorm was demolished Client: Swedish American Hospital | Permit id: Mulcom20101589 | |||||
Swedish american medical imaging. Selective demolition of existing improvements and mep/fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. No structural alterations. Building plan review # 10-1106 Date: March 1, 2011 Value: $249,800 Client: Swedish American Hospital | Permit id: Mulcom20107655 | |||||
Replace 4 rtus - 70,0 btus, 75cfm exhaust, ductwork, refrigeration-(1) condensing unitswedish american medical imaging. Date: April 8, 2011 Value: $84,430 Client: Swedish American Hospital | Permit id: Mech20102558 | |||||
SCORE 96 Swedish american medical imaging. Selective demolition of existing improvements and mep/fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. No structural alterations. Building plan review # 10-1106electrical work per plans for remodel Client: Swedish American Hospital | Permit id: Elect20101862 | |||||
Fire suppression - heads swedish american medical imaging. Date: May 25, 2011 Value: $5,500 Client: Swedish American Hospital | Permit id: Plum20102121 | |||||
Swedish american medical imaging phase ii. Selective demolition of existing improvements and mep/fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. Minor structural alterations. Building plan review # 11-0706 repl. Rtu (ahu) = 18. 75 ton - btu 225k child permit Date: November 2, 2011 Value: $118,740 Client: Swedish American Hospital | Permit id: Mech20112000 | |||||
Replace existing wv, lavadd one new hsink Date: February 3, 2012 Value: $9,000 Client: Swedish American Hospital | Permit id: Plum20102120 | |||||
2-3-12 sprinkler - heads child permit swedish american medical imaging phase ii. Selective demolition of existing improvements and mep/fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. Minor structural alterations. Building plan review # 11-0706 Date: February 3, 2012 Client: Swedish American Hospital | Permit id: Plum20111690 | |||||
9 wc, 9lav, 6 hand sinks, 9 fl drswedish american medical imaging phase ii. Selective demolition of existing improvements and mep/fp systems. Building plan review # 11-0706 Date: February 3, 2012 Client: Swedish American Hospital | Permit id: Plum20111689 | |||||
3-10-12 ductwork - exhaust 2,475 cfm notes: misc ductwork, re-worked child permit swedish american medical imaging phase ii. Selective demolition of existing improvements and mep/fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. Minor structural alterations. Building plan review # 11-0706 Date: April 10, 2012 Value: $244,395 Client: Swedish American Hospital | Permit id: Mech20121416 | |||||
SCORE 93 (electrical) "swedish administration" - 1st floor & basement interior remodeling. Ref. Plan review #08-1203. Relocation adminstration office of swedes on ground level. Selective demolition and remodeling of an existing adjacent waiting space. Date: May 20, 2009 Contractor: Pierce Steve Client: Swedish American Hospital | Permit id: Elect20081114 | |||||
SCORE 89 Relocation adminstration office of swedes on ground level. Selective demolition and remodeling of an existing adjacent waiting space. M,e,p,fp work is included. 2 vav boxes; 1. 5 kw duct heaters; 1 kw ele reheat Date: August 11, 2009 Contractor: Ballard Dennis Client: Swedish American Hospital | Permit id: Mech20081335 | |||||
SCORE 89 1,500,0 btu Client: Swedish American Hospital | Permit id: Mech20092471 | |||||
SCORE 89 Swedish american servery remodel. (1) ex fan @ 1375 cfm, (1) ex fan @ 28 cfm, (1) ex fan @ 3325 cfm Date: January 21, 2010 Contractor: Ballard Dennis Client: Swedish American Hospital | Permit id: Mech20092470 | |||||
SCORE 89 7 nozzles, - 2 systems Client: Ringland Johnson | Permit id: Mech20092472 | |||||
SCORE 89 Risk management offices @ swedes. Renovation of hospital lab space on the second level. The scope of work will include demolition of walls, flooring, ceiling and fixtures. Then new work. M,e,p,fp work is included. Plan revew #09-0917. Date: November 12, 2009 Contractor: Ballard Dennis Client: Swedish American Hospital | Permit id: Mech20092384 | |||||
SCORE 96 (5) 1 ton ac units, ductwork Client: Swedish American Hospital | Permit id: Mech20101465 | |||||
SCORE 96 Swedish american medical imaging phase ii. Selective demolition of existing improvements and mep/fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. Minor structural alterations. Building plan review # 11-0706 repl. Rtu (ahu) = 18. 75 ton - btu 225k child permit Client: Swedish American Hospital | Permit id: Mech20112000 | |||||
SCORE 93 Provide stairs to mechanical equipment from roof to mechanical roof. Client: Swedish American Hospital, Alise Howlett | Permit id: Mulcom20081222 | |||||
SCORE 86 Revolving door at swedes. Door replacements and associated footing, foundation, and walkway construction. Plan revew #10-0405. Client: Swedish American Hospital | Permit id: Mulcom20101228 | |||||
SCORE 89 Swedish american medical imaging. Selective demolition of existing improvements and mep/fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. No structural alterations. Building plan review # 10-1106 Client: Swedish American Hospital | Permit id: Mulcom20107655 | |||||
SCORE 65 Demolition of nurses dorm #3 Client: Swedish American Hospital | Permit id: Mulcom20101572 | |||||
SCORE 93 Ssa renovation at swedes. Ssa will remain active, with 3 phases of work with full dust and infection control. The project is to relocate the break room, an office and expand existing ante/drop off room. Plan revew #10-0218. Date: July 19, 2010 Contractor: Mcmahon Ed Client: Swedish American Hospital | Permit id: Plum20101665 | |||||
SCORE 93 Relocation adminstration office of swedes on ground level. Selective demolition and remodeling of an existing adjacent waiting space. M,e,p,fp work is included. 1 wc, 1 lav, 1 hand sink, 1 fd Date: June 1, 2009 Contractor: Brown Terry Client: Swedish American Hospital | Permit id: Plum20081104 | |||||
SCORE 93 Fire suppression 2478 sq. Ft. 26 heads 08-1203 Permit id: Plum20091454 | |||||
SCORE 93 (2) hs, (1) ms, (15) fd Client: Ringland Johnson | Permit id: Plum20091844 | |||||
SCORE 93 Risk management offices @ swedes. Renovation of hospital lab space on the second level. The scope of work will include demolition of walls, flooring, ceiling and fixtures. Then new work. M,e,p,fp work is included. Plan revew #09-0917. Fire suppression. 6 heads. Date: November 23, 2009 Contractor: Mcmahon Ed Client: Swedish American Hospital | Permit id: Plum20091793 | |||||
SCORE 93 Replace existing wv, lavadd one new hsink Client: Swedish American Hospital | Permit id: Plum20102120 | |||||
SCORE 93 1 wc, 1 lav, 1 fd Client: Ringland Johnson | Permit id: Plum20101504 | |||||
SCORE 93 2-3-12 sprinkler - heads child permit swedish american medical imaging phase ii. Selective demolition of existing improvements and mep/fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. Minor structural alterations. Building plan review # 11-0706 Date: February 3, 2012 Contractor: Mcmahon Ed Client: Swedish American Hospital | Permit id: Plum20111690 | |||||
SCORE 93 (1) ks Client: Swedish American Hospital | Permit id: Plum20101124 | |||||
SCORE 96 3-10-12 ductwork - exhaust 2,475 cfm notes: misc ductwork, re-worked child permit swedish american medical imaging phase ii. Selective demolition of existing improvements and mep/fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. Minor structural alterations. Building plan review # 11-0706 Client: Swedish American Hospital | Permit id: Mech20121416 | |||||
SCORE 89 (3) 4" dual duct vav(2) 6" dual duct vav Client: Swedish American Hospital | Permit id: Mech20101219 | |||||
SCORE 86 Ssa renovation at swedes. Ssa will remain active, with 3 phases of work with full dust and infection control. The project is to relocate the break room, an office and expand existing ante/drop off room. Plan revew #10-0218. Client: Swedish American Hospital | Permit id: Mulcom20101109 | |||||
SCORE 93 Fire suppression - heads swedish american medical imaging. Client: Swedish American Hospital | Permit id: Plum20102121 | |||||
SCORE 93 (electrical) "swedish american" - servery remodel. Remodel the existing servery. Expansion 3273 sq ft. Ref. Plan review 09-1104. Date: January 6, 2010 Contractor: Pierce Steve Client: Swedish American Hospital | Permit id: Elect20091858 | |||||
SCORE 93 9 wc, 9lav, 6 hand sinks, 9 fl drswedish american medical imaging phase ii. Selective demolition of existing improvements and mep/fp systems. Building plan review # 11-0706 Date: February 3, 2012 Contractor: Schiavo Kevin Client: Swedish American Hospital | Permit id: Plum20111689 | |||||
SCORE 96 Replace 4 rtus - 70,0 btus, 75cfm exhaust, ductwork, refrigeration-(1) condensing unitswedish american medical imaging. Client: Swedish American Hospital | Permit id: Mech20102558 | |||||
SCORE 96 3-10-12 ductwork - exhaust 2,475 cfm notes: misc ductwork, re-worked child permit swedish american medical imaging phase ii. Selective demolition of existing improvements and mep fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. Minor structural alterations. Building plan review # 11-0706 Client: Swedish American Hospital | Permit id: Mech20121416 | |||||
SCORE 89 (3) 4" dual duct vav(2) 6" dual duct vav Client: Swedish American Hospital | Permit id: Mech20101219 | |||||
SCORE 96 (electrical) "ssa - surgical services area". (1) new 225 amp mlo panelboard, relocating existing 225 amp mlo panelboard, new lighting, outlets and switches. Ssa renovation at swedes. Ssa will remain active, with 3 phases of work with full dust and infection control. The project is to relocate the break room, an office and expand existing ante drop off room. Ref. Plan review #10-0215. P. O. #100322. 6 22 10, this permit is in (3) phases. Phase i is complete. 7 9 10, phase ii has now begun. Date: March 19, 2010 Contractor: Wilson Electric Co Client: Swedish American Hospital | Permit id: Elect20101114 | |||||
SCORE 89 Swedish american medical imaging. Selective demolition of existing improvements and mep fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. No structural alterations. Building plan review # 10-1106 Client: Swedish American Hospital | Permit id: Mulcom20107655 | |||||
SCORE 96 (electrical) "risk management offices" - office remodel: new lighting & outlets, wiring to existing panels, #5-7-9 & 11. P. O. #91014. Renovate lab 2nd floor. Plan revew #09-0917. Date: October 30, 2009 Contractor: Wilson Electric Co Client: Swedish American Hospital | Permit id: Elect20091819 | |||||
SCORE 93 (2) hs, (1) ms, (15) fd Client: Ringland Johnson | Permit id: Plum20091844 | |||||
SCORE 93 Risk management offices @ swedes. Renovation of hospital lab space on the second level. The scope of work will include demolition of walls, flooring, ceiling and fixtures. Then new work. M,e,p,fp work is included. Plan revew #09-0917. Fire suppression. 6 heads. Date: November 23, 2009 Contractor: Mcmahon, Ed Client: Swedish American Hospital | Permit id: Plum20091793 | |||||
SCORE 93 2-3-12 sprinkler - heads child permit swedish american medical imaging phase ii. Selective demolition of existing improvements and mep fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. Minor structural alterations. Building plan review # 11-0706 Date: February 3, 2012 Contractor: Mcmahon, Ed Client: Swedish American Hospital | Permit id: Plum20111690 | |||||
SCORE 89 Swedish american servery remodel. (1) ex fan @ 1375 cfm, (1) ex fan @ 28 cfm, (1) ex fan @ 3325 cfm Date: January 21, 2010 Contractor: Ballard, Dennis Client: Swedish American Hospital | Permit id: Mech20092470 | |||||
SCORE 89 7 nozzles, - 2 systems Client: Ringland Johnson | Permit id: Mech20092472 | |||||
SCORE 93 Fire suppression - heads swedish american medical imaging. Client: Swedish American Hospital | Permit id: Plum20102121 | |||||
SCORE 96 Swedish american medical imaging phase ii. Selective demolition of existing improvements and mep fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. Minor structural alterations. Building plan review # 11-0706 repl. Rtu (ahu) = 18. 75 ton - btu 225k child permit Client: Swedish American Hospital | Permit id: Mech20112000 | |||||
SCORE 86 Ssa renovation at swedes. Ssa will remain active, with 3 phases of work with full dust and infection control. The project is to relocate the break room, an office and expand existing ante drop off room. Plan revew #10-0218. Client: Swedish American Hospital | Permit id: Mulcom20101109 | |||||
SCORE 65 Demolition of nurses dorm #3 Client: Swedish American Hospital | Permit id: Mulcom20101572 | |||||
SCORE 96 (5) 1 ton ac units, ductwork Client: Swedish American Hospital | Permit id: Mech20101465 | |||||
SCORE 96 Replace 4 rtus - 70,0 btus, 75cfm exhaust, ductwork, refrigeration-(1) condensing unitswedish american medical imaging. Client: Swedish American Hospital | Permit id: Mech20102558 | |||||
SCORE 93 (electrical) "swedish administration" - 1st floor & basement interior remodeling. Ref. Plan review #08-1203. Relocation adminstration office of swedes on ground level. Selective demolition and remodeling of an existing adjacent waiting space. Date: May 20, 2009 Contractor: Pierce, Steve Client: Swedish American Hospital | Permit id: Elect20081114 | |||||
SCORE 89 1,500,0 btu Client: Swedish American Hospital | Permit id: Mech20092471 | |||||
SCORE 93 Relocation adminstration office of swedes on ground level. Selective demolition and remodeling of an existing adjacent waiting space. M,e,p,fp work is included. 1 wc, 1 lav, 1 hand sink, 1 fd Date: June 1, 2009 Contractor: Brown, Terry Client: Swedish American Hospital | Permit id: Plum20081104 | |||||
SCORE 93 Fire suppression 2478 sq. Ft. 26 heads 08-1203 Permit id: Plum20091454 | |||||
SCORE 93 Replace existing wv, lavadd one new hsink Client: Swedish American Hospital | Permit id: Plum20102120 | |||||
SCORE 89 Relocation adminstration office of swedes on ground level. Selective demolition and remodeling of an existing adjacent waiting space. M,e,p,fp work is included. 2 vav boxes; 1. 5 kw duct heaters; 1 kw ele reheat Date: August 11, 2009 Contractor: Ballard, Dennis Client: Swedish American Hospital | Permit id: Mech20081335 | |||||
SCORE 89 Risk management offices @ swedes. Renovation of hospital lab space on the second level. The scope of work will include demolition of walls, flooring, ceiling and fixtures. Then new work. M,e,p,fp work is included. Plan revew #09-0917. Date: November 12, 2009 Contractor: Ballard, Dennis Client: Swedish American Hospital | Permit id: Mech20092384 | |||||
SCORE 93 Ssa renovation at swedes. Ssa will remain active, with 3 phases of work with full dust and infection control. The project is to relocate the break room, an office and expand existing ante drop off room. Plan revew #10-0218. Date: July 19, 2010 Contractor: Mcmahon, Ed Client: Swedish American Hospital | Permit id: Plum20101665 | |||||
SCORE 93 (electrical) "swedish american" - servery remodel. Remodel the existing servery. Expansion 3273 sq ft. Ref. Plan review 09-1104. Date: January 6, 2010 Contractor: Pierce, Steve Client: Swedish American Hospital | Permit id: Elect20091858 | |||||
SCORE 93 Provide stairs to mechanical equipment from roof to mechanical roof. Client: Swedish American Hospital, Alise Howlett | Permit id: Mulcom20081222 | |||||
SCORE 93 (1) ks Client: Swedish American Hospital | Permit id: Plum20101124 | |||||
SCORE 96 Swedish american medical imaging. Selective demolition of existing improvements and mep fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. No structural alterations. Building plan review # 10-1106electrical work per plans for remodel Client: Swedish American Hospital | Permit id: Elect20101862 | |||||
SCORE 93 9 wc, 9lav, 6 hand sinks, 9 fl drswedish american medical imaging phase ii. Selective demolition of existing improvements and mep fp systems. Building plan review # 11-0706 Date: February 3, 2012 Contractor: Schiavo, Kevin Client: Swedish American Hospital | Permit id: Plum20111689 | |||||
SCORE 96 Swedish american medical imaging. Selective demolition of existing improvements and mep fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. No structural alterations. Building plan review # 10-1106electrical work per plans for remodel Client: Swedish American Hospital | Permit id: Elect20101862 | |||||
SCORE 89 Swedish american servery remodel. Remodel the existing servery. Plan review 09-1104. Date: January 25, 2010 Contractor: Nelson Fire Protection Client: Swedish American Hospital | Permit id: Plum20091845 | |||||
SCORE 89 Electrical: wiring and electrical work associated with remodel. Swedish american medical imaging phase ii. Selective demolition of existing improvements and mep/fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. Minor structural alterations. Building plan review # 11-0706 Client: Swedish American Hospital | Permit id: Elect20111427 | |||||
SCORE 93 Swedish american medical imaging phase ii. Selective demolition of existing improvements and mep/fp systems. New wall partitions, ceiling systems, & wall finishes will be constructed. Minor structural alterations. Building plan review # 11-0706 Client: Swedish American Hospital | Permit id: Mulcom20111451 | |||||
SCORE 96 (electrical) "ssa - surgical services area". (1) new 225 amp mlo panelboard, relocating existing 225 amp mlo panelboard, new lighting, outlets and switches. Ssa renovation at swedes. Ssa will remain active, with 3 phases of work with full dust and infection control. The project is to relocate the break room, an office and expand existing ante drop off room. Ref. Plan review #10-0215. P. O. #100322. 6 22 10, this permit is in (3) phases. Phase i is complete. 7 9 10, phase ii has now begun. Date: March 19, 2010 Contractor: Wilson Electric Co Client: Swedish American Hospital | Permit id: Elect20101114 | |||||
SCORE 96 (electrical) "risk management offices" - office remodel: new lighting & outlets, wiring to existing panels, #5-7-9 & 11. P. O. #91014. Renovate lab 2nd floor. Plan revew #09-0917. Date: October 30, 2009 Contractor: Wilson Electric Co Client: Swedish American Hospital | Permit id: Elect20091819 |