Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Bathroom remodel, sf. Date: August 4, 2015 Value: $2,650 Permit type: Residential addition-alteration | Permit status: Finaled | Current use: Residential | Permit id: B15-3466 | Parcel: 009231006 | |||||
SCORE 69 4 sf addition. Added to scope 1 11 2016: revised page 2 on the plans modifying location of built-in closet and new bathroom within existing space to have a change in floor plan. Resulting 3-bed, 2-bath. Permit type: Residential addition-alteration | Permit status: Finaled | Current use: Residential | Permit id: B15-4338 | Parcel: 009231006 | |||||
SCORE 98 Replace furnace, a c and new ducts. Btus afue 95% seer 18. Date: November 23, 2015 Contractor: Moore Heating And Air Conditioning Permit type: Residential mechanical | Permit status: Finaled | Current use: Residential | Permit id: B15-5343 | Parcel: 009231006 | |||||
Installation of 1. 68kw, 6 panel, roof mounted photovoltaic system. Contractor identified c- subcontractor as: thor electric lic. #995798. - 3 30 16 - added to scope of work - upgrading electrical service panel Date: February 8, 2016 Value: $7,500 Permit type: Residential addition-alteration | Permit status: Finaled | Current use: Residential | Permit id: B16-0453 | Parcel: 009231006 |