ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd no. Of modules: 7 no. Of inverters:7 micro inverters total system size in kilowatts: 1. 57 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 23, 2011Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: April 8, 2011 | Permit id: Pds2011-1031-20 | |||||
Roof mount residential solar pv for existing sfd no. Of modules 7 no. Of inverters 7 micro inverters total system size in kilowatts 1. 57 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 23, 2011Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 8, 2011 | Permit id: Pds2011-1031-20 | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: April 20, 2016Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 12, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 89 Roof mount residential solar pv for existing sfd no. Of modules 7 no. Of inverters 7 micro inverters total system size in kilowatts 1. 57 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 23, 2011 Contractor: Smart Home Remodeling IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: April 8, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 96 Res 30 sf reroof if a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt shingles proposed roofing material asphalt shingles manufacturer owens corning brand and model true definition color (if cool roof required) sage built-up roofing assembly system number per attached listing report (if applicable) na specific exemption from cool roof requirements (if applicable) na required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: March 3, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: June 30, 2017 Contractor: Airmaxx IncPermit type: Addn | Permit status: Completed | Completion date: November 1, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: March 1, 2017Permit status: Pass | Permit id: Pds2017-Resalt- | |||||
Final Date: May 10, 2016Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Final Date: April 6, 2011Permit status: Pass | Permit id: Pds2011-1031-20 |