ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] i am installing a 7. 28 kw grid tied solar system on my house. 7/7/16 jk approved plans. Date: May 11, 2016 Contractor: Foster EdPermit type: Electrical | Permit status: Permit issued | Expiration date: May 11, 2017 | Current use: Single family / duplex | Permit id: 6534472 | |||||
SCORE 56 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] i am installing a 7. 28 kw grid tied solar system on my house. 7 7 16 jk approved plans. Date: May 11, 2016 Contractor: Foster, EdPermit type: Electrical | Permit status: Permit closed | Completion date: October 10, 2016 | Expiration date: May 11, 2017 | Current use: Single family / duplex | Permit id: 6534472 |