ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
27 sf re-roof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material: proposed roofing material: manufacturer: brand and model: color (if cool roof required): built-up roofing assembly system number per attached listing report (if applicable): specific exemption from cool roof requirements (if applicable): required building inspector field verification (if applicable): note: self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: March 30, 2015 Value: $16,011Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: April 21, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 82 The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: March 23, 2015 Contractor: John AlmondPermit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: June 2, 2015 | Permit id: Pds2015-Resalt- | |||||
Relocate existing water meter due to vacation of current easement. Date: December 16, 2010Permit type: Plumbing : 80 - acc | Permit status: Permit finaled | Completion date: January 13, 2011 | Permit id: Pds2010-1011-20 | |||||
Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 200a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: March 23, 2015Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 2, 2015 | Permit id: Pds2015-Resalt- | |||||
27 sf re-roof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material proposed roofing material manufacturer brand and model color (if cool roof required) built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: March 30, 2015 Value: $16,011Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 21, 2015 | Permit id: Pds2015-Resalt- | |||||
Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: February 14, 2016Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 17, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 73 27 sf re-roof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material proposed roofing material manufacturer brand and model color (if cool roof required) built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 21, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 200a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: March 23, 2015 Contractor: Semper Solaris Construction IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: June 2, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: February 14, 2016 Contractor: Accurate Comfort Systems IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: June 17, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: June 15, 2016Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Final Date: May 29, 2015Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Date: January 10, 2011Permit status: Pass | Permit id: Pds2010-1011-20 |