ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 89 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 29, 2014 Contractor: Brian MilhollandPermit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: March 9, 2015 | Permit id: Pds2014-Resalt- | |||||
362 sqft pool for existing sfd (master plan 77) Date: April 1, 2014 Value: $27,874Permit type: Pool/spa : 3293 - re | Permit status: Permit finaled | Completion date: June 13, 2014 | Permit id: Pds2014-Resacc- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 29, 2014 Contractor: Milholland Electric IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: March 9, 2015 | Permit id: Pds2014-Resalt- | |||||
362 sqft pool for existing sfd (master plan 77) Date: April 1, 2014 Value: $27,874Permit type: New residential acc structure | Permit status: Completed | Completion date: June 13, 2014 | Permit id: Pds2014-Resacc- | |||||
SCORE 72 2100sf reroof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt shingles proposed roofing material asphalt shingles manufacturer owens corning brand and model oakridge color (if cool roof required) amber built-up roofing assembly system number per attached listing report (if applicable) na specific exemption from cool roof requirements (if applicable) na required building inspector field verification (if applicable) na note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 5, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Date: November 4, 2015Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Date: June 11, 2014Permit status: Pass | Permit id: Pds2014-Resacc- |