Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 37 sqft re-roof to (e) sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material comp shingles proposed roofing material comp shingles manufacturer gaf brand and model timberline hd color (if cool roof required) crrc 0676-0098 built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) n a required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: August 2, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: October 30, 2017 Contractor: A S I Hastings Inc Permit type: Addn | Permit status: Completed | Completion date: December 27, 2017 | Permit id: Pds2017-Resalt- |