ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 93 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: December 13, 2016 Contractor: Approved Air IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: January 10, 2017 | Permit id: Pds2016-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 9, 2016 Contractor: Solarcity CorporationPermit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: February 13, 2017 Contractor: Solarcity CorporationPermit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade) and new ev charge station (misc. Electrical permit) persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: May 31, 2017 Contractor: N B Baker Electric IncPermit type: Addn | Permit status: Completed | Completion date: July 21, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 88 5 sf re-roof for sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material tile proposed roofing material shingles manufacturer owens corning brand and model supreme color (if cool roof required) amber built-up roofing assembly system number per attached listing report (if applicable) na specific exemption from cool roof requirements (if applicable) na required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Final Date: January 5, 2017Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 9, 2016 Contractor: Solarcity CorporationPermit type: Res roof mt solar pv | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 93 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: December 13, 2016 Contractor: Approved Air IncPermit type: Mechanical - hvac change out | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade) and new ev charge station (misc. Electrical permit) persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: May 31, 2017 Contractor: N B Baker Electric IncPermit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2017-Resalt- | |||||
SCORE 88 5 sf re-roof for sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material tile proposed roofing material shingles manufacturer owens corning brand and model supreme color (if cool roof required) amber built-up roofing assembly system number per attached listing report (if applicable) na specific exemption from cool roof requirements (if applicable) na required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Misc. (antennas, tennis cts, gazebo) | Permit status: Issued | Permit id: Pds2017-Resalt- | Parcel: 2213201500 | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: February 13, 2017 Contractor: Solarcity CorporationPermit type: Res roof mt solar pv | Permit status: Issued | Permit id: Pds2017-Resalt- |