ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Hvac change out - split system - ductwork- and misc elec. This project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. 08-17-2015 plan change to add ductwork. Maz 08-13-2015 plan change to include elec and mech for installation. Maz Date: August 13, 2015Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2015-Resalt- | |||||
SCORE 93 Hvac change out - split system - ductwork- and misc elec. This project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. 08-17-2015 plan change to add ductwork. Maz 08-13-2015 plan change to include elec and mech for installation. Maz Date: August 13, 2015 Contractor: Sherlock Heating And Air Conditioning IncPermit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2015-Resalt- |