ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 74 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: May 19, 2017 Contractor: Precision Temperature IncPermit type: Addn | Permit status: Completed | Completion date: July 21, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 4. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 11 27 12 plan change -- epm only -- m1a Date: November 5, 2012 Contractor: Sullivan Solar Power Of California IncPermit type: Addn | Permit status: Completed | Completion date: December 10, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 4. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 11 27 12 plan change -- epm only -- m1a Date: November 5, 2012 Contractor: Sullivan Solar Power Of California IncPermit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 3954310200 | |||||
SCORE 74 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: May 19, 2017 Contractor: Precision Temperature IncPermit type: Hvac change out | Permit status: Completed | Permit id: Pds2017-Resalt- |