ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 99 Staging of materials for an construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days. Date: April 23, 2013 Contractor: Corinthian Contractors IncPermit type: Excavation; repair water service lateral | Permit status: Approved (pending payment | Expiration date: August 1, 2013 | |||||
SCORE 76 Moving truck Date: December 20, 2012 Contractor: John WheelerPermit status: Expired | Expiration date: December 28, 2012 | Permit id: Pa10082313 | |||||
SCORE 99 Excavation; repair water service lateral Contractor: Corinthian Contractors IncPermit status: 3 | Expiration date: August 1, 2013 | Permit id: 0 | |||||
SCORE 86 Moving truck Date: August 5, 2016 Contractor: Kloke GroupPermit status: Expired | Expiration date: August 18, 2016 | Permit id: Pa10329558 | |||||
SCORE 100 Staging of materials for an construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days. Contractor: Dcwater OpsPermit status: Cancel/withdrawn | Expiration date: August 1, 2013 | Permit id: 0 | |||||
SCORE 86 Moving truck Date: August 10, 2016 Contractor: Kloke GroupPermit status: Permit expired | Expiration date: August 12, 2016 | Permit id: Pa10330340 | |||||
SCORE 99 Excavation; repair water service lateral Contractor: Corinthian Contractors IncPermit status: 3 | Expiration date: August 1, 2013 | Permit id: 0 | |||||
SCORE 100 Staging of materials for an construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days. Contractor: Dcwater OpsPermit status: Cancel/withdrawn | Expiration date: August 1, 2013 | Permit id: 0 | |||||
SCORE 62 Repair step and part of my leadwalk that are cracked and have allowed water to erode the sand behind them. I want to resurface the steps and leadwalk in the same dimensions as the existing walkway. Date: September 24, 2015 Contractor: Chris HensmanPermit type: Paving; leadwalk w/steps | Permit status: Permit expired | Expiration date: November 6, 2015 | Permit id: Pa116536 | |||||
SCORE 62 Moving truck Date: August 10, 2016 Contractor: Chris HensmanPermit status: Permit expired | Expiration date: August 12, 2016 | Permit id: Pa10330314 | |||||
SCORE 56 Moving truck Date: August 6, 2016 Contractor: Michael EichlerPermit status: Permit expired | Expiration date: August 16, 2016 | Permit id: Pa10329731 |