ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 86 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 9, 2013 Contractor: Cody OramPermit type: Electrical : 8003 - | Permit status: Permit issued | Permit id: Pds2013-Resalt- | |||||
Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: December 27, 2015Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2015-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 9, 2013 Contractor: Vivint Solar Developer LlcPermit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2013-Resalt- | |||||
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: December 27, 2015 Contractor: Accurate Comfort Systems IncPermit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2015-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: April 7, 2017 Contractor: Sunrun Installation Services IncPermit type: Addn | Permit status: Completed | Completion date: May 12, 2017 | Permit id: Pds2017-Resalt- |