Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Suppression permit Date: June 16, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 284635 | |||||
Mechanical permit Date: January 8, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 509513 | |||||
Mechanical permit Date: June 3, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 212834 | |||||
Fast form building permit Date: July 21, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 165675 | |||||
Alteration permit Date: May 11, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 74474 | |||||
Alteration permit Date: May 6, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 211322 | |||||
Plumbing permit Date: October 29, 2015 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 647970 | |||||
Plumbing permit Date: June 16, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 347950 | |||||
Alteration permit Date: March 29, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 393180 | |||||
Fast form building permit Date: June 7, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 81298 | |||||
Mechanical permit Date: August 8, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 486897 | |||||
Alteration permit Date: January 18, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 448928 | |||||
Plumbing permit Date: August 29, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 492060 | |||||
Electrical permit Date: June 26, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 78265 | |||||
Suppression permit Date: April 24, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 212359 | |||||
Fast form building permit Date: July 27, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Active | Permit id: 228665 | |||||
Zoning/use permit Date: March 9, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 223803 | |||||
Electrical permit Date: August 11, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 226194 | |||||
Suppression permit Date: August 8, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 167029 | |||||
Mechanical permit Date: April 5, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 396529 | |||||
Alteration permit Date: August 23, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 280565 | |||||
New construction permit Date: July 15, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 480368 | |||||
Electrical permit Date: October 29, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 309061 | |||||
Plumbing permit Date: July 28, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 228921 | |||||
Demolition permit Date: June 3, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 344818 | |||||
Plumbing permit Date: May 1, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 397553 | |||||
Electrical permit Date: September 26, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 489814 | |||||
Zoning/use permit Date: July 15, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 480366 | |||||
Mechanical permit Date: April 5, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 396529 | |||||
Alteration permit Date: January 18, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 448928 | |||||
Mechanical permit Date: June 3, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 212834 | |||||
Plumbing permit Date: May 1, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 397553 | |||||
Alteration permit Date: August 16, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 89944 | |||||
Plumbing permit Date: August 29, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 492060 | |||||
Plumbing permit Date: June 16, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 347954 | |||||
New construction permit Date: July 15, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 480368 | |||||
Alteration permit Date: August 12, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 22880 | |||||
Electrical permit Date: February 15, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Expired | Permit id: 56819 | |||||
Electrical permit Date: October 29, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 309061 | |||||
Fast form building permit Date: July 27, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Active | Permit id: 228665 | |||||
Fast form building permit Date: June 7, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 81298 | |||||
Electrical permit Date: September 3, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 232026 | |||||
Plumbing permit Date: July 28, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 228921 | |||||
Suppression permit Date: August 8, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 167029 | |||||
Suppression permit Date: June 16, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 284635 | |||||
Zoning use permit Date: March 9, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 223803 | |||||
Suppression permit Date: April 24, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 212359 | |||||
Electrical permit Date: September 26, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 489814 | |||||
Plumbing permit Date: October 29, 2015 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 647970 | |||||
Zoning use permit Date: July 15, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 480366 | |||||
Mechanical permit Date: January 8, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 509513 | |||||
Mechanical permit Date: August 8, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 486897 | |||||
Fast form building permit Date: July 21, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 165675 | |||||
Alteration permit Date: August 23, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 280565 | |||||
Alteration permit Date: March 29, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 393180 | |||||
Demolition permit Date: June 3, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 344818 | |||||
SCORE 100 Fixture replacement Date: July 28, 2009 Contractor: Fluidics Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 8, 2010 | Permit id: 228921 | |||||
SCORE 100 New lighting, switches, recepts, 1 lighting panel, 1 - 75kva transformer, 2 - 208 120v panels as per 2005 nec (north district) Date: September 3, 2009 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: December 7, 2010 | Permit id: 232026 | |||||
SCORE 100 Removal of (2) 5 gallon heating tanks and close in (1) 5 gallon heating oil tank for hospital. Date: June 3, 2011 Contractor: Ferrick Const Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Demolition permit | Permit status: Completed | Completion date: February 6, 2012 | Permit id: 344818 | |||||
SCORE 100 Relocate sprinkler heads Date: June 16, 2010 Contractor: Oliver Sprinkler Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: March 14, 2011 | Permit id: 284635 | |||||
SCORE 100 Install smoke detectors, duct detectors, pull stations, strobes & a v devices. Date: October 7, 2009 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: January 12, 2010 | Permit id: 236043 | |||||
SCORE 100 Roofing: remove modified bitumen, with slag, roofcovering. Install 0. F. A. Carlisle t. P. O. Roof. Date: August 23, 2010 Contractor: Belcher Roofing Corporation Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: April 29, 2011 | Permit id: 280565 | |||||
SCORE 100 Install category 5 communications cable to 16 work station as per 2008 nec Date: October 29, 2010 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: January 12, 2011 | Permit id: 309061 | |||||
SCORE 100 Sanitary: replace 5" house trap, repair house drain and install new fresh air inlet Date: June 16, 2011 Contractor: Herman Goldner Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 1, 2011 | Permit id: 347950 | |||||
SCORE 96 Int renovations to the 3rd floor of a medical office bldg. Date: March 29, 2012 Contractor: Dupuy Construction Service Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: March 25, 2014 | Permit id: 393180 | |||||
SCORE 100 Tear existing roof off to substrate install new carlisle 0 epdm fully adhered roofing system install new counter flashing and new coping Date: January 18, 2013 Contractor: Belcher Roofing Corporation Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 3, 2014 | Permit id: 448928 | |||||
SCORE 100 Install new hvac, including ductwork for medical office. Date: April 5, 2012 Contractor: Ramm Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 396529 | |||||
SCORE 100 Installing water and waste pipe to accomodate new renovations, installing fixtures- 4 water closets, 1 urinal, 4 lavs, 22 exam room sinks & 4 floor drains (hospital) Date: May 1, 2012 Contractor: John J Mulholland Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 20, 2015 | Permit id: 397553 | |||||
SCORE 100 Install 1 - 5 gallon double wall above ground storage tank for diesel fuel for emergency generator Date: July 15, 2013 Contractor: Ferrick Const Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 15, 2013 | Permit id: 480366 | |||||
SCORE 100 Fast form building permit Date: March 28, 2008 Contractor: Oliver Sprinkler Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Completion date: December 31, 2008 | Permit id: 141450 | |||||
SCORE 100 Install an automatic sprinkler system. Date: August 8, 2008 Contractor: Oliver Sprinkler Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: June 1, 2010 | Permit id: 167029 | |||||
SCORE 100 Interior renovation on 2nd floor paley building as per plans Date: May 6, 2009 Contractor: Florkowski Builders Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: January 13, 2016 | Permit id: 211322 | |||||
SCORE 100 Relocate 8 sprinkler heads (2nd floor orthodontics 2 palay) Date: April 24, 2009 Contractor: Fire Protection Industries Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: October 16, 2009 | Permit id: 212359 | |||||
SCORE 100 Fast form building permit Date: August 3, 2007 Contractor: Oliver Sprinkler Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Completion date: January 12, 2015 | Permit id: 93819 | |||||
Construction of 139 space parking lot, site lighting and related improvements. (24) compact, (5) handicap. Date: March 9, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 9, 2011 | Permit id: 223803 | |||||
Hvac alterations as per plans Date: June 3, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 9, 2010 | Permit id: 212834 | |||||
SCORE 100 Interior alterations on 2nd floor lab# 2 as showm on approved plans. Date: July 17, 2009 Contractor: Florkowski Builders Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: October 16, 2009 | Permit id: 225451 | |||||
SCORE 100 Conduits for equip & telephone & data systems only, fa devices reinstalled into new ceiling, install new high hats (9), (4) exam lights & controls, relocate power for medical equip & raceways, relocate floor rec for table, as per 2005 nec re install fire alarm devices into new ceiling as per nfpa-72 Date: August 11, 2009 Contractor: Par 4 Electric Corp Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: May 20, 2010 | Permit id: 226194 | |||||
SCORE 100 Fast form building permit Date: July 27, 2009 Contractor: Majek Fire Protection, Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Active | Completion date: July 27, 2009 | Permit id: 228665 | |||||
Interior alt. To onocology suite incl finish upgrades, new rooms. Date: August 12, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: August 17, 2009 | Permit id: 22880 | |||||
SCORE 81 Install four (4) new diffusers registers within the second floor lab #2 as per plan. Date: August 25, 2009 Contractor: Jack Arkin Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 27, 2015 | Permit id: 228893 | |||||
SCORE 100 Remove one 5 gallon undergournd storage tank obtain soil samples per dep guide lines, back fill and compact. Form and pour reinforced cncrete pad. Provide and install one ul-listed, 5 gallon double wall, fire-protected, above-ground storage tank and surrounding 6" dia, concrete-filled bollards to protect tank from vehicle impact and 5high (min) fence with locked gate to secure installation from public access. Date: July 15, 2013 Contractor: Ferrick Const Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: New construction permit | Permit status: Completed | Completion date: October 26, 2014 | Permit id: 480368 | |||||
SCORE 99 Hvac for pharmacy fit-out. See ap#485677 for plans. Asbestos removal required prior to the start of work. Date: August 8, 2013 Contractor: Wm Steele And Sons Company Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 21, 2015 | Permit id: 486897 | |||||
SCORE 99 Alteration to existing office space for employee pharmacy accessory to hospital. Asbestos removal required prior to the start of work. Date: August 8, 2013 Contractor: Wm Steele And Sons Company Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: November 23, 2014 | Permit id: 485677 | |||||
SCORE 99 Modify existing office space;no changes to exits. See a p #74797 for ductwork Date: May 11, 2007 Contractor: Wm Steele And Sons Company Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: July 11, 2007 | Permit id: 74474 | |||||
SCORE 100 Repair a section of a broken 4" house drain (self certifications are no longer accepted all trenches exceeding 5 must have approved shoring) Date: October 29, 2015 Contractor: Herman Goldner Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 8, 2016 | Permit id: 647970 | |||||
SCORE 92 Install 79 lt and 61 recepts.(north dist) Date: June 26, 2007 Contractor: Donald Belles Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: January 9, 2008 | Permit id: 78265 | |||||
SCORE 98 Install 37- cat 6a and fiber backbone plenum cables on first floor of building 1321... In accordance with 2008 nec (medical office) Date: February 16, 2017 Contractor: Coastal Communications Group I Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: February 16, 2017 | Permit id: 756728 | |||||
SCORE 82 Fast form building permit Date: June 7, 2007 Contractor: Grinnell Fire Prot Systs Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Completion date: January 31, 2008 | Permit id: 81298 | |||||
SCORE 100 Renovations for lab, xrays, etc. Date: August 16, 2007 Contractor: Target Building Construction Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: October 15, 2007 | Permit id: 89944 | |||||
SCORE 100 New lights and receptacles, modify fire alarm, replace one panel as per 2008 nec & nfpa 72(health care facility) Date: September 26, 2013 Contractor: Raff Electric Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: December 10, 2013 | Permit id: 489814 | |||||
SCORE 100 Install underground pipe for 1 water closet, 1 lav, 2 sinks, 1 indirect waste, 1 water heater (office space) Date: August 29, 2013 Contractor: Limbach Company Llc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 29, 2015 | Permit id: 492060 | |||||
SCORE 100 Mechanical alterations, reconfiguration and installation of hvac system, include hot water heating coils, exhaust fans and humidifier with all associated ductwork, piping and grids as per plans. Date: January 8, 2014 Contractor: Edward B Oreilly And Assoc Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 21, 2015 | Permit id: 509513 | |||||
SCORE 100 Set cabinet, roof top location, connecting 2 pole 208 volt amp circuit. Installing grounding, installation of a phone line. Date: February 15, 2007 Contractor: Mjk Electrical Corporation Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: February 15, 2007 | Permit id: 56819 | |||||
SCORE 100 Fast form building permit Date: March 15, 2007 Contractor: Majek Fire Protection, Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Completion date: January 31, 2008 | Permit id: 62289 |