Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 Electrical Date: September 23, 2016 Contractor: Edward William Evans Permit status: Inspections | Current use: Residential | Permit id: Bld2016-08931 | |||||
SCORE 99 Relocating the ks, guest and master baths. Adding a wet bar. Date: September 23, 2016 Contractor: Black Hawk Plumbing And Heating Inc Permit type: Plumbing | Permit status: Inspections | Current use: Residential | Permit id: Bld2016-08930 | |||||
SCORE 100 Date: September 9, 2016 Contractor: Na Permit id: Bld2016-08474 | |||||
SCORE 100 Date: September 26, 2016 Contractor: Na Permit id: Bld2016-08930 | |||||
SCORE 100 Date: September 23, 2016 Contractor: Na Permit id: Bld2016-08931 | |||||
SCORE 56 Install tpo over existing roof Date: April 5, 2017 Contractor: Tom Larsen Construction Permit type: Roofing | Permit status: Closed | Current use: Residential | Permit id: Bld2017-02656 | |||||
SCORE 100 Furnace replacement Date: October 2, 2017 Contractor: Ueac, Inc. Dba Sameday Dba Utah Engineering Permit type: Mechanical | Permit status: Inspections | Current use: Residential | Permit id: Bld2017-08672 |