ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
(electrical) "sinissippi greenhouse" - sculpture lighting to n. 2nd street light. Date: July 28, 2009 Value: $2,800Client: Rockford Park District | Permit id: Elect20091538 | |||||
SCORE 93 Plan review 09-0507. New conservatory, growing greenhouse, public meeting space, office, classroom. Client: Ringland Johnson | Permit id: Mulcom20091298 | |||||
Demolition of existing greenhouse building Date: July 31, 2009 Value: $15,000Client: Rockford Park District | Permit id: Mulcom20091518 | |||||
SCORE 89 (electrical) "nicholas conservatory & gardens" - (1) 16 amp service - 3-phase. A. S. C. C. Form required prior to service inspection!! (1) generator, (7) 2 amp feeders, (5) solar systems and speaker system. W. O. #15-59100. Plan review 09-0507. New conservatory, growing greenhouse, public meeting space, office, classroom. Date: August 4, 2009 Contractor: Ballard Companies IncClient: Rockford Park District | Permit id: Elect20091320 | |||||
(2) shower, (11) wc, (3) urinal, (12) lav, (2) ks, (1) tankless wh, (1) ws, (3) water cooler, (1) hs, (3) ms, (1) 3 comp, (1) gt, (28) fd, (3) rpz, sewer & water, (2) eye wash, (2) sediment interceptors Date: April 19, 2010 Value: $360,000Client: Rockford Park District | Permit id: Plum20091329 | |||||
SCORE 93 Install new service Date: June 2, 2010 Contractor: Rockford Water DivisionPermit id: Row20101788 | |||||
SCORE 95 Plan review 09-0507. New conservatory, growing greenhouse, public meeting space, office, classroom. Fire suppression permit. Date: June 21, 2010 Contractor: Absolute Fire ProtectionClient: Rockford Park District | Permit id: Plum20091330 | |||||
Raise meter & backflow & install box above grade levelfar end of rose garden, closest to lagoon - kind of in an odd place Date: November 10, 2010 Value: $1,000Client: Rockford Park District | Permit id: Plum20102081 | |||||
Plan review 09-0507. New conservatory, growing greenhouse, public meeting space, office, classroom. Hvac permit. Furnace 92% 60,0 btu; 6 boilers 399,0 btu; ductwork; 6 exhaust fans 12,7 cfm; gas piping 2,554,0 btu, 1 uh-1= 100,0 btu, 6 boiler 2,394,0 btu, 2 baseboard 22 watts, 20- fcu-1 2,960,0 btu, 1 erv 30 cfm in 30 cfm out, 2 ww -1 592,0 btu, 5 heat pump air to water 187,3 btu. Date: January 6, 2011Client: Rockford Park District | Permit id: Mech20091543 | |||||
Relocated floor drain to floor sink. Change out water heater - gal 199,0 btu, softerner bypass Date: October 4, 2011 Value: $10,300Client: Rockford Park District | Permit id: Plum20111977 | |||||
Forest city queen dock. Construct foundation, docks, railing, revetment mat, lighting (2). Building plan review # 12-0404. Permit fees waived2012-177cr 43. Alderman elyea moved the adoption of a planning and development committee report recommending that the in-kind services request between the city of rockford and rockford park district be approved. The city will provide an in kind contribution of approximately 2,165 for permit fee waiver for the nicholas conservatorys dock permit. In kind services request. Motion prevailed by a roll call vote of:ayes: durkee, curran, mark, jacobson, johnson, timm, beach, elyea, mcneely, robertson -10-nays: -0-abstain: beck -1-absent: wasco, hervey, thompson-kelly -3- city council minutes may 7, 2012 Date: April 24, 2012 Value: $179,230Client: Rockford Park District | Permit id: Mulcom20121189 | |||||
Intall 2 new 15 foot - 150w light poles. Forest city queen dock. Construct foundation, docks, railing, revetment mat, lighting (2). Building plan review #12-0404. Date: May 31, 2012Client: Rockford Park District | Permit id: Elect20121260 | |||||
Repl. Damaged underground 2 volt - amp feed to vendors panel with trenched in 1" pvc conduit having 3 x #6 thhn plus #8 ground Date: June 13, 2012 Value: $3,500Client: Rockford Park District | Permit id: Elect20121421 | |||||
SCORE 89 (electrical) "sinissippi greenhouse" - sculpture lighting to n. 2nd street light. Client: Rockford Park District | Permit id: Elect20091538 | |||||
SCORE 89 Intall 2 new 15 foot - 150w light poles. Forest city queen dock. Construct foundation, docks, railing, revetment mat, lighting (2). Building plan review #12-0404. Date: May 31, 2012 Contractor: Gauerke GeneClient: Rockford Park District | Permit id: Elect20121260 | |||||
SCORE 89 Plan review 09-0507. New conservatory, growing greenhouse, public meeting space, office, classroom. Hvac permit. Furnace 92% 60,0 btu; 6 boilers 399,0 btu; ductwork; 6 exhaust fans 12,7 cfm; gas piping 2,554,0 btu, 1 uh-1= 100,0 btu, 6 boiler 2,394,0 btu, 2 baseboard 22 watts, 20- fcu-1 2,960,0 btu, 1 erv 30 cfm in 30 cfm out, 2 ww -1 592,0 btu, 5 heat pump air to water 187,3 btu. Date: January 6, 2011 Contractor: Ballard DennisClient: Rockford Park District | Permit id: Mech20091543 | |||||
SCORE 93 Demolition of existing greenhouse building Client: Rockford Park District | Permit id: Mulcom20091518 | |||||
SCORE 89 Forest city queen dock. Construct foundation, docks, railing, revetment mat, lighting (2). Building plan review # 12-0404. Permit fees waived2012-177cr 43. Alderman elyea moved the adoption of a planning and development committee report recommending that the in-kind services request between the city of rockford and rockford park district be approved. The city will provide an in kind contribution of approximately 2,165 for permit fee waiver for the nicholas conservatorys dock permit. In kind services request. Motion prevailed by a roll call vote of:ayes: durkee, curran, mark, jacobson, johnson, timm, beach, elyea, mcneely, robertson -10-nays: -0-abstain: beck -1-absent: wasco, hervey, thompson-kelly -3- city council minutes may 7, 2012 Client: Rockford Park District | Permit id: Mulcom20121189 | |||||
SCORE 89 (2) shower, (11) wc, (3) urinal, (12) lav, (2) ks, (1) tankless wh, (1) ws, (3) water cooler, (1) hs, (3) ms, (1) 3 comp, (1) gt, (28) fd, (3) rpz, sewer & water, (2) eye wash, (2) sediment interceptors Client: Rockford Park District | Permit id: Plum20091329 | |||||
SCORE 96 Raise meter & backflow & install box above grade levelfar end of rose garden, closest to lagoon - kind of in an odd place Client: Rockford Park District | Permit id: Plum20102081 | |||||
SCORE 96 Relocated floor drain to floor sink. Change out water heater - gal 199,0 btu, softerner bypass Client: Rockford Park District | Permit id: Plum20111977 | |||||
SCORE 89 Repl. Damaged underground 2 volt - amp feed to vendors panel with trenched in 1" pvc conduit having 3 x #6 thhn plus #8 ground Client: Rockford Park District | Permit id: Elect20121421 | |||||
SCORE 95 Plan review 09-0507. New conservatory, growing greenhouse, public meeting space, office, classroom. Fire suppression permit. Date: June 21, 2010 Contractor: Absolute Fire ProtectionClient: Rockford Park District | Permit id: Plum20091330 | |||||
SCORE 89 Repl. Damaged underground 2 volt - amp feed to vendors panel with trenched in 1" pvc conduit having 3 x #6 thhn plus #8 ground Client: Rockford Park District | Permit id: Elect20121421 | |||||
SCORE 96 Relocated floor drain to floor sink. Change out water heater - gal 199,0 btu, softerner bypass Client: Rockford Park District | Permit id: Plum20111977 | |||||
SCORE 93 Demolition of existing greenhouse building Client: Rockford Park District | Permit id: Mulcom20091518 | |||||
SCORE 89 (electrical) "sinissippi greenhouse" - sculpture lighting to n. 2nd street light. Client: Rockford Park District | Permit id: Elect20091538 | |||||
SCORE 96 Raise meter & backflow & install box above grade levelfar end of rose garden, closest to lagoon - kind of in an odd place Client: Rockford Park District | Permit id: Plum20102081 | |||||
SCORE 89 Intall 2 new 15 foot - 150w light poles. Forest city queen dock. Construct foundation, docks, railing, revetment mat, lighting (2). Building plan review #12-0404. Date: May 31, 2012 Contractor: Gauerke, GeneClient: Rockford Park District | Permit id: Elect20121260 | |||||
SCORE 89 Plan review 09-0507. New conservatory, growing greenhouse, public meeting space, office, classroom. Hvac permit. Furnace 92% 60,0 btu; 6 boilers 399,0 btu; ductwork; 6 exhaust fans 12,7 cfm; gas piping 2,554,0 btu, 1 uh-1= 100,0 btu, 6 boiler 2,394,0 btu, 2 baseboard 22 watts, 20- fcu-1 2,960,0 btu, 1 erv 30 cfm in 30 cfm out, 2 ww -1 592,0 btu, 5 heat pump air to water 187,3 btu. Date: January 6, 2011 Contractor: Ballard, DennisClient: Rockford Park District | Permit id: Mech20091543 | |||||
SCORE 89 (2) shower, (11) wc, (3) urinal, (12) lav, (2) ks, (1) tankless wh, (1) ws, (3) water cooler, (1) hs, (3) ms, (1) 3 comp, (1) gt, (28) fd, (3) rpz, sewer & water, (2) eye wash, (2) sediment interceptors Client: Rockford Park District | Permit id: Plum20091329 | |||||
SCORE 89 Forest city queen dock. Construct foundation, docks, railing, revetment mat, lighting (2). Building plan review # 12-0404. Permit fees waived2012-177cr 43. Alderman elyea moved the adoption of a planning and development committee report recommending that the in-kind services request between the city of rockford and rockford park district be approved. The city will provide an in kind contribution of approximately 2,165 for permit fee waiver for the nicholas conservatorys dock permit. In kind services request. Motion prevailed by a roll call vote of:ayes: durkee, curran, mark, jacobson, johnson, timm, beach, elyea, mcneely, robertson -10-nays: -0-abstain: beck -1-absent: wasco, hervey, thompson-kelly -3- city council minutes may 7, 2012 Client: Rockford Park District | Permit id: Mulcom20121189 | |||||
SCORE 89 2 amp (temp) service, 120/2 single phase. W. O. #15-59100. Client: Rockford Park District | Permit id: Elect20091568 | |||||
SCORE 95 Plan review 09-0507. New conservatory, growing greenhouse, public meeting space, office, classroom. Fire suppression permit. Date: June 21, 2010 Contractor: Absolute Fire ProtectionClient: Rockford Park District | Permit id: Plum20091330 |