Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: February 11, 2013 Client: Rabi Ullah | Applicant: Rabi Ullah | Permit type: Building | Permit status: Permit issued | Permit id: Pc22042659 | |||||
Ft x 15 ft pressure treated wooden deck Date: May 6, 2013 Client: Rabi Ullah | Applicant: Washdesigngroup | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1306014 | |||||
Propose to replace pressure treated wooden fence. Six feet with gate. Date: May 6, 2013 Client: Rabi Ullah | Applicant: Washdesigngroup | Permit type: Fence | Permit status: Permit issued | Permit id: F1300343 | |||||
Plumbing and gas Date: March 7, 2013 Client: Mary Bundy | Applicant: Phillip B. Mobley | Permit status: Completed | Permit id: P1303324 | |||||
Proposed to replace and repair. Electrical , plumbing and mech fixtures. Drywall as indicated per plan. Repair existing decks on the 1st and 2nd floor to replace flooring, handrail only. No structural change in the existing deck. All new kitchen appliances ceramic tile baths Date: March 4, 2013 Client: Mary Bundy | Applicant: Washdesigngroup | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1304453 | |||||
SCORE 96 Electrical Date: March 7, 2013 Contractor: Gregory E Ligon Client: Mary Bundy | Permit status: Completed | Permit id: E1303581 | |||||
SCORE 93 Mechanical Date: March 7, 2013 Contractor: Phillip B Mobley Client: Mary Bundy | Permit status: Completed | Permit id: M1301078 | |||||
SCORE 96 Plumbing and gas Date: March 7, 2013 Contractor: Phillip B. Mobley Client: Mary Bundy | Permit status: Completed | Permit id: P1303324 | |||||
SCORE 96 Electrical Date: March 7, 2013 Contractor: Gregory E Ligon Client: Mary Bundy | Permit status: Completed | Permit id: E1303581 | |||||
SCORE 93 Mechanical Date: March 7, 2013 Contractor: Phillip B Mobley Client: Mary Bundy | Permit status: Completed | Permit id: M1301078 | |||||
SCORE 96 Plumbing and gas Date: March 7, 2013 Contractor: Phillip B. Mobley Client: Mary Bundy | Permit status: Completed | Permit id: P1303324 | |||||
SCORE 93 Proposed to replace and repair. Electrical , plumbing and mech fixtures. Drywall as indicated per plan. Repair existing decks on the 1st and 2nd floor to replace flooring, handrail only. No structural change in the existing deck. All new kitchen appliances ceramic tile baths Date: March 4, 2013 Contractor: Washdesigngroup Client: Mary Bundy | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1304453 | |||||
SCORE 93 Ft x 15 ft pressure treated wooden deck Date: May 6, 2013 Contractor: Washdesigngroup Client: Rabi Ullah | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1306014 | |||||
SCORE 93 Propose to replace pressure treated wooden fence. Six feet with gate. Date: May 6, 2013 Contractor: Washdesigngroup Client: Rabi Ullah | Permit type: Fence | Permit status: Permit issued | Permit id: F1300343 | |||||
SCORE 69 Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: February 11, 2013 Contractor: Rabi Ullah Client: Rabi Ullah | Permit type: Building | Permit status: Permit issued | Permit id: Pc22042659 | |||||
SCORE 96 Electrical Date: March 7, 2013 Contractor: Gregory E Ligon Client: Mary Bundy | Permit status: Completed | Permit id: E1303581 | |||||
SCORE 96 Plumbing and gas Date: March 7, 2013 Contractor: Phillip B. Mobley Client: Mary Bundy | Permit status: Completed | Permit id: P1303324 | |||||
SCORE 93 Mechanical Date: March 7, 2013 Contractor: Phillip B Mobley Client: Mary Bundy | Permit status: Completed | Permit id: M1301078 |