ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 8. 40kw pv system on roof Date: August 4, 2015 Contractor: Sme Inc Of SeattlePermit type: Electrical | Permit status: Permit closed | Completion date: August 19, 2015 | Expiration date: August 3, 2016 | Current use: Single family / duplex | Permit id: 6487890 | |||||
SCORE 95 Cancel per customer log 16-23 telecommunications work wireless alarm Date: September 11, 2015 Contractor: Adt LlcPermit type: Electrical | Permit status: Permit issued | Expiration date: September 10, 2016 | Current use: Single family / duplex | Permit id: 6494259 | |||||
SCORE 95 Install boiler Date: December 2, 2016 Contractor: Greenwood Heating And AcApplicant: Greenwood Heating And Ac | Permit type: Boiler / pressure vessel | Permit status: Permit issued | Expiration date: June 2, 2018 | Current use: Single family / duplex | Permit id: 6568812 | |||||
SCORE 100 4 bedroom addition. 4/20/06 elj add-on (1)30-50a ded. Cir Date: December 5, 2005 Contractor: Cisco Electric IncorporatedPermit type: Electrical | Permit status: Permit finaled | Completion date: April 23, 2006 | Expiration date: December 5, 2006 | Current use: Single family / duplex | Permit id: 6081155 |