ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Addition permit Date: August 26, 2016Client: Poeng Thai I Poeng Ennie | Permit status: Active | Permit id: 678983 | |||||
Zoning/use permit Date: February 27, 2015Client: Poeng Thai I Poeng Ennie | Permit status: Completed | Permit id: 554895 | |||||
Addition permit Date: August 26, 2016Client: Poeng Thai I Poeng Ennie | Permit status: Active | Permit id: 678983 | |||||
Zoning use permit Date: February 27, 2015Client: Poeng Thai I Poeng Ennie | Permit status: Completed | Permit id: 554895 | |||||
For the erection of an attached structure with cellar. Size and location as shown in the application plans. For the creation of two (2) open-air, off-street parking spaces accessory to a vacant commercial space on cellar and first floor (use registration permit required prior to occupancy) and a two-family dwelling on the second and third floors.+ Date: February 27, 2015Client: Poeng Thai I Poeng Ennie | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 4, 2016 | Permit id: 554895 | |||||
SCORE 100 For the installation of an automatic fire suppression system throughout a three-story mixed-use building in accordance with nfpa 13 standards. System to be equipped with a backflow prevention assembly and is serviced via a 2" fire service main line. Date: March 10, 2017 Contractor: Elite Fire ProtectionClient: Poeng Thai I Poeng Ennie | Permit type: Suppression permit | Permit status: Active | Completion date: October 2, 2017 | Permit id: 745203 | |||||
SCORE 86 For the erection of a three (3) story above grade plane, w. Basement, mixed-use two (2) family dwelling w. Vacant 1st floor space of reinforced concrete foundation (including underpinning), engineered open web wood joist truss & structural steel framing, wood frame braced wall panel & low-slope roof construction building; building to be fully sprinklered per nfpa 13. Site to be excavated at areas adjacent to existing structure(s) not within the scope of this permit. Permit holder to notify owner(s) of adjoining property(ies) no less than ten (10) days prior to commencement of permitted work. Separate permit reqd for bsmt. & 1st flr fit-out & any mech., elec., plumb. & firesupp work. Date: August 26, 2016 Contractor: John P Hovanec IncClient: Poeng Thai I Poeng Ennie | Permit type: Addition permit | Permit status: Active | Completion date: July 26, 2017 | Permit id: 678983 |