ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 86 The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: July 25, 2014 Contractor: Cody OramPermit type: Electrical : 8002 - | Permit status: Permit issued | Permit id: Pds2014-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 200a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: July 25, 2014 Contractor: Vivint Solar Developer LlcPermit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2014-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 14, 2016 Contractor: Petersendean IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: December 5, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: September 21, 2017Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Final Date: December 1, 2016Permit status: Pass | Permit id: Pds2016-Resalt- |