SCORE 87 Installation of pallet racking @ slc boeing airport south receiving bld. Installation details: - location: boeing airport south receiving bld storage area. Install three sections of pallet racking (end to end). (approx 24ft total length) - utilize existing boeing pallet racking, step beams (108" length & 60" length) 3,0 lb shelf capacity or equivalent. Each section: approx 42" from floor to bottom of first beam, then 3 rows with approx 36" opening between each row. - utilize existing boeing wire deck (2) per pallet shelf. - new supplied (4) ea. Pallet racking uprights #rtfbg042144bp0113xbvg. 42" deep x 12ft tall with extra bracing. - new supplied anchors for attaching pallet racking to the floor as per engineered specs. - new supplied shelf weight capacities stickers installed centered on every pallet shelf location front & back. - includes all equipment & labor to install the above mechanical equipment. - includes picking up existing racking parts from wj boeing. Date: May 12, 2015 Contractor: Aid Equipment Company LlcPermit type: Permit | Permit status: Completed | Completion date: August 3, 2015 | Current use: Commercial | Permit id: Bld2015-03337 | |||||
SCORE 100 Water sampling pit w ejector Date: January 26, 2015 Contractor: Bigd Construction CorpPermit type: Permit | Permit status: Accepted - standard | Completion date: January 26, 2015 | Current use: Commercial | Permit id: Bld2015-00534 | |||||
SCORE 73 New shelving installation at boeing air port pain mixing room Date: August 5, 2014 Contractor: Aid EquipmentPermit type: Permit | Permit status: Pass | Completion date: October 14, 2014 | Current use: Commercial | Permit id: Bld2014-05599 | |||||
SCORE 100 Electrical permit, job bid 20,000. Not in conjunction with canopy. Date: January 21, 2014 Contractor: Skyline Electric CompanyPermit type: Electrical | Permit status: Completed | Completion date: January 21, 2014 | Current use: Commercial | Permit id: Bld2014-00377 | |||||
SCORE 100 Low voltage fire alarm. Date: February 17, 2010 Contractor: Fire Protection ServicesPermit type: Low voltage | Permit status: In progress | Completion date: February 18, 2010 | Current use: Commercial | Permit id: Bld2010-00804 | |||||
Installation of pallet racking @ slc boeing airport south receiving bld. Installation details: - location: boeing airport south receiving bld storage area. Install three sections of pallet racking (end to end). (approx 24ft total length) - utilize existing boeing pallet racking, step beams (108" length & 60" length) 3,0 lb shelf capacity or equivalent. Each section: approx 42" from floor to bottom of first beam, then 3 rows with approx 36" opening between each row. - utilize existing boeing wire deck (2) per pallet shelf. - new supplied (4) ea. Pallet racking uprights #rtfbg042144bp0113xbvg. 42" deep x 12ft tall with extra bracing. - new supplied anchors for attaching pallet racking to the floor as per engineered specs. - new supplied shelf weight capacities stickers installed centered on every pallet shelf location front & back. - includes all equipment & labor to install the above mechanical equipment. - includes picking up existing racking parts from wj boeing. Date: May 12, 2015Permit type: Permit | Permit status: Pass | Completion date: August 3, 2015 | Current use: Commercial | Permit id: Bld2015-03337 | |||||
Water sampling pit w/ ejector Date: January 26, 2015Permit type: Permit | Permit status: In progress | Completion date: January 26, 2015 | Current use: Commercial | Permit id: Bld2015-00534 | |||||
SCORE 64 New shelving installation at boeing air port pain mixing room Date: August 5, 2014Permit type: Permit | Permit status: Inspections | Completion date: October 14, 2014 | Current use: Commercial | Permit id: Bld2014-05599 | |||||
SCORE 64 Providing power and control wiring for automation of pain booth Date: June 18, 2014 Contractor: Skyline Electric Companyboeing Paint BoothPermit type: Electrical | Permit status: Closed | Completion date: October 23, 2014 | Current use: Commercial | Permit id: Bld2014-04274 | |||||
SCORE 64 Elec work for pavilion project Date: November 21, 2013Permit type: Electrical | Permit status: Closed | Completion date: April 1, 2014 | Current use: Commercial | Permit id: Bld2013-08676 | |||||
Relocate existing canopy on new footings & flatwork, no elec/plmbg/mech work k. A. A. M. Date: November 5, 2013Permit type: Permit | Permit status: Pass | Completion date: March 28, 2014 | Current use: Commercial | Permit id: Bld2013-08205 | |||||
SCORE 64 Minimum electrical up to 1600. Date: March 14, 2013 Contractor: Phillip Brady ElectricboeingPermit type: Electrical | Permit status: Closed | Completion date: March 21, 2013 | Current use: Commercial | Permit id: Bld2013-01479 | |||||
Install new paint facility at boeing Date: December 21, 2012Permit type: Mechanical | Permit status: No certificate req | Completion date: January 14, 2013 | Current use: Commercial | Permit id: Bld2012-09285 | |||||
1 roof mounted air handler, 4 radiant heaters, 3 roof mounted exhaust fans, 1 elec unit heater, ductwork Date: December 17, 2012Permit type: Mechanical | Permit status: Completed | Completion date: January 14, 2013 | Current use: Commercial | Permit id: Bld2012-09180 | |||||
SCORE 64 Fire alarm upgrade to boeing paint booth Date: November 2, 2012 Contractor: Fire Protection Servicesboeing Paint BoothPermit type: Low voltage | Permit status: No certificate req | Completion date: January 14, 2013 | Current use: Commercial | Permit id: Bld2012-08158 | |||||
SCORE 64 Construction of new assembly line requiring four (4) new electrical panels and associated wiring to new equipment. Electrical work as per scope of bld2012-03849. Date: September 14, 2012 Contractor: Skyline Electric Companyboeing Assembly LinePermit type: Electrical | Permit status: Closed | Completion date: June 13, 2013 | Current use: Commercial | Permit id: Bld2012-06821 | |||||
SCORE 64 Installing conduit and wiring to new crane. Date: August 15, 2012 Contractor: Midwest Electric Incboeing West BldgPermit type: Electrical | Permit status: No certificate req | Completion date: January 14, 2013 | Current use: Commercial | Permit id: Bld2012-06055 | |||||
Add 4 new sprinklers in vacuum pump addition to existing building @ nwc. Date: June 21, 2012Permit type: Fire | Permit status: Pass | Completion date: August 13, 2012 | Current use: Commercial | Permit id: Bld2012-04556 | |||||
SCORE 64 New paint facility for boeing. Loacted behind existing building Date: June 5, 2012 Contractor: Boeing Paint Facility Phase IiPermit type: Fire | Permit status: Completed | Completion date: January 14, 2013 | Current use: Commercial | Permit id: Bld2012-04128 | |||||
Interior remodel of factory d. D. Interior work only a. H. D. W. Date: May 24, 2012Permit type: Permit | Permit status: Pass | Completion date: June 14, 2013 | Current use: Commercial | Permit id: Bld2012-03849 | |||||
SCORE 64 Interior remodel with small addition. Zone - interior work only. L. L. A. H. Date: March 26, 2012 Contractor: H H I Corporationboeing Assembly Line Phase 2Permit type: Permit | Permit status: Closed | Completion date: June 14, 2013 | Current use: Commercial | Permit id: Bld2012-02233 | |||||
Phased approval, no structural review was performed, installation of rammed aggregate piers at owners risk provide k. A. "a" zone owners are proceeding at their own risk regarding building height, parking, etc k. B. Date: January 19, 2012Permit type: Permit | Permit status: Pass | Completion date: January 10, 2013 | Current use: Commercial | Permit id: Bld2012-00488 | |||||
SCORE 64 Concrete trench to contain electrical wiring. (arch. Stamp was needed ll) zone: airport district, interior work for trench. As Date: January 11, 2012 Contractor: H H I CorporationboeingPermit type: Permit | Permit status: Closed | Completion date: February 1, 2012 | Current use: Commercial | Permit id: Bld2012-00273 | |||||
Minimum elect permit. Rmp work order #5475141. Date: December 14, 2011Permit type: Electrical | Permit status: Pass | Completion date: January 29, 2013 | Current use: Commercial | Permit id: Bld2011-08191 | |||||
Sprinkler blower shed and dust collector with small dry system supplying six sprinklers. Date: February 16, 2011Permit type: Fire | Permit status: Pass | Completion date: April 8, 2011 | Current use: Commercial | Permit id: Bld2011-00961 | |||||
Elec work for remodel for boeing 787 moving line Date: November 12, 2010Permit type: Electrical | Permit status: Pass | Completion date: April 26, 2011 | Current use: Commercial | Permit id: Bld2010-07830 | |||||
Remodel for boeing 787 moving line Date: September 29, 2010Permit type: Permit | Permit status: Pass | Completion date: April 27, 2011 | Current use: Commercial | Permit id: Bld2010-06482 | |||||
Elec work and connections for replacement of paint booths & ovens. Date: April 7, 2010Permit type: Electrical | Permit status: Pass | Completion date: April 8, 2010 | Current use: Commercial | Permit id: Bld2010-01955 | |||||
SCORE 64 Low voltage fire alarm. Date: February 17, 2010 Contractor: Fire Protection Servicesspray Painting FacilityPermit type: Low voltage | Permit status: In for review | Completion date: February 18, 2010 | Current use: Commercial | Permit id: Bld2010-00804 | |||||
Fire sprinkler system for paint booth Date: February 4, 2010Permit type: Fire | Permit status: Pass | Completion date: May 17, 2010 | Current use: Commercial | Permit id: Bld2010-00566 | |||||
SCORE 64 Replacement of paint booths and ovens. A zone. Aircraft assembly bldg. Dd kb Date: January 29, 2010 Contractor: Bci Construction Usa Incspray Painting FacilityPermit type: Permit | Permit status: Closed | Completion date: January 27, 2012 | Current use: Commercial | Permit id: Bld2010-00477 | |||||
Water sampling pit w/ ejector Date: January 26, 2015Permit status: Inspections | Current use: Commercial | Permit id: Bld2015-00534 | |||||
Installation of pallet racking @ slc boeing airport south receiving bld. Installation details: - location: boeing airport south receiving bld storage area. Install three sections of pallet racking (end to end). (approx 24ft total length) - utilize existing boeing pallet racking, step beams (108" length & 60" length) 3,0 lb shelf capacity or equivalent. Each section: approx 42" from floor to bottom of first beam, then 3 rows with approx 36" opening between each row. - utilize existing boeing wire deck (2) per pallet shelf. - new supplied (4) ea. Pallet racking uprights #rtfbg042144bp0113xbvg. 42" deep x 12ft tall with extra bracing. - new supplied anchors for attaching pallet racking to the floor as per engineered specs. - new supplied shelf weight capacities stickers installed centered on every pallet shelf location front & back. - includes all equipment & labor to install the above mechanical equipment. - includes picking up existing racking parts from wj boeing. Date: August 6, 2015Permit status: In for review | Current use: Commercial | Permit id: Bld2015-03337 | |||||
SCORE 61 New shelving installation at boeing air port pain mixing room Date: October 14, 2014Permit status: Inspections | Current use: Commercial | Permit id: Bld2014-05599 | |||||
SCORE 56 Fire sprinkler system for paint booth Date: February 4, 2010 Contractor: Delta Fire Systems Inc.Boeing Paint BoothPermit type: Fire | Permit status: Closed | Completion date: May 17, 2010 | Current use: Commercial | Permit id: Bld2010-00566 | |||||
SCORE 56 Elec work and connections for replacement of paint booths & ovens. Date: April 7, 2010Permit type: Electrical | Permit status: Closed | Completion date: April 8, 2010 | Current use: Commercial | Permit id: Bld2010-01955 | |||||
Remodel for boeing 787 moving line Date: September 29, 2010Permit status: Closed | Completion date: April 27, 2011 | Current use: Commercial | Permit id: Bld2010-06482 | |||||
SCORE 56 Elec work for remodel for boeing 787 moving line Date: November 12, 2010 Contractor: Capital Electric Inc.Boeing 787 Moving LinePermit type: Electrical | Permit status: Closed | Completion date: April 26, 2011 | Current use: Commercial | Permit id: Bld2010-07830 | |||||
SCORE 56 Sprinkler blower shed and dust collector with small dry system supplying six sprinklers. Date: February 16, 2011Permit type: Fire | Permit status: Closed | Completion date: April 8, 2011 | Current use: Commercial | Permit id: Bld2011-00961 | |||||
SCORE 71 Minimum elect permit. Rmp work order #5475141. Date: December 14, 2011 Contractor: Craig F Sorensen Construction IncqwestPermit type: Electrical | Permit status: Closed | Completion date: January 29, 2013 | Current use: Commercial | Permit id: Bld2011-08191 | |||||
SCORE 56 Phased approval, no structural review was performed, installation of rammed aggregate piers at owners risk provide k. A. "a" zone owners are proceeding at their own risk regarding building height, parking, etc k. B. Date: January 19, 2012Permit status: Closed | Completion date: January 10, 2013 | Current use: Commercial | Permit id: Bld2012-00488 | |||||
Interior remodel of factory d. D. Interior work only a. H. D. W. Date: May 24, 2012Permit status: Closed | Completion date: June 14, 2013 | Current use: Commercial | Permit id: Bld2012-03849 | |||||
Add 4 new sprinklers in vacuum pump addition to existing building @ nwc. Date: June 21, 2012Permit type: Fire | Permit status: Closed | Completion date: August 13, 2012 | Current use: Commercial | Permit id: Bld2012-04556 | |||||
SCORE 56 1 roof mounted air handler, 4 radiant heaters, 3 roof mounted exhaust fans, 1 elec unit heater, ductwork Date: December 17, 2012Permit type: Mechanical | Permit status: Closed | Completion date: January 14, 2013 | Current use: Commercial | Permit id: Bld2012-09180 | |||||
SCORE 56 Install new paint facility at boeing Date: December 21, 2012Permit type: Mechanical | Permit status: Closed | Completion date: January 14, 2013 | Current use: Commercial | Permit id: Bld2012-09285 | |||||
Relocate existing canopy on new footings & flatwork, no elec/plmbg/mech work k. A. A. M. Date: November 5, 2013Permit status: Closed | Completion date: March 28, 2014 | Current use: Commercial | Permit id: Bld2013-08205 | |||||
SCORE 64 Replacement of paint booths and ovens. A zone. Aircraft assembly bldg. Dd kb Date: January 29, 2010 Contractor: Bci Construction Usa Incspray Painting FacilityPermit status: Closed | Completion date: January 27, 2012 | Current use: Commercial | Permit id: Bld2010-00477 | |||||
SCORE 59 Fire sprinkler system for paint booth Date: February 4, 2010 Contractor: Delta Fire Systems, Inc.Boeing Paint BoothPermit type: Fire | Permit status: Closed | Completion date: May 17, 2010 | Current use: Commercial | Permit id: Bld2010-00566 | |||||
SCORE 64 Low voltage fire alarm. Date: February 17, 2010 Contractor: Fire Protection Servicesspray Painting FacilityPermit type: Low voltage | Permit status: In for review | Completion date: February 18, 2010 | Current use: Commercial | Permit id: Bld2010-00804 | |||||
SCORE 59 Elec work and connections for replacement of paint booths & ovens. Date: April 7, 2010Permit type: Electrical | Permit status: Closed | Completion date: April 8, 2010 | Current use: Commercial | Permit id: Bld2010-01955 | |||||
SCORE 59 Remodel for boeing 787 moving line Date: September 29, 2010 Contractor: Bigd Construction Corp.Boeing 787 Moving LinePermit status: Closed | Completion date: April 27, 2011 | Current use: Commercial | Permit id: Bld2010-06482 | |||||
SCORE 59 Elec work for remodel for boeing 787 moving line Date: November 12, 2010 Contractor: Capital Electric, Inc.Boeing 787 Moving LinePermit type: Electrical | Permit status: Closed | Completion date: April 26, 2011 | Current use: Commercial | Permit id: Bld2010-07830 | |||||
SCORE 59 Sprinkler blower shed and dust collector with small dry system supplying six sprinklers. Date: February 16, 2011Permit type: Fire | Permit status: Closed | Completion date: April 8, 2011 | Current use: Commercial | Permit id: Bld2011-00961 | |||||
SCORE 79 Minimum elect permit. Rmp work order #5475141. Date: December 14, 2011 Contractor: Craig F Sorensen Construction, IncqwestPermit type: Electrical | Permit status: Closed | Completion date: January 29, 2013 | Current use: Commercial | Permit id: Bld2011-08191 | |||||
SCORE 64 Concrete trench to contain electrical wiring. (arch. Stamp was needed ll) zone: airport district, interior work for trench. As Date: January 11, 2012 Contractor: H H I CorporationboeingPermit status: Closed | Completion date: February 1, 2012 | Current use: Commercial | Permit id: Bld2012-00273 | |||||
SCORE 59 Phased approval, no structural review was performed, installation of rammed aggregate piers at owners risk provide k. A. "a" zone owners are proceeding at their own risk regarding building height, parking, etc k. B. Date: January 19, 2012Permit status: Closed | Completion date: January 10, 2013 | Current use: Commercial | Permit id: Bld2012-00488 | |||||
SCORE 64 Interior remodel with small addition. Zone - interior work only. L. L. A. H. Date: March 26, 2012 Contractor: H H I Corporationboeing Assembly Line Phase 2Permit status: Closed | Completion date: June 14, 2013 | Current use: Commercial | Permit id: Bld2012-02233 | |||||
SCORE 65 Interior remodel of factory d. D. Interior work only a. H. D. W. Date: May 24, 2012 Contractor: Bigd Construction Corp.Boeing Assembly LinePermit status: Closed | Completion date: June 14, 2013 | Current use: Commercial | Permit id: Bld2012-03849 | |||||
SCORE 64 New paint facility for boeing. Loacted behind existing building Date: June 5, 2012 Contractor: Boeing Paint Facility Phase IiPermit type: Fire | Permit status: Closed | Completion date: January 14, 2013 | Current use: Commercial | Permit id: Bld2012-04128 | |||||
SCORE 59 Add 4 new sprinklers in vacuum pump addition to existing building @ nwc. Date: June 21, 2012Permit type: Fire | Permit status: Closed | Completion date: August 13, 2012 | Current use: Commercial | Permit id: Bld2012-04556 | |||||
SCORE 64 Installing conduit and wiring to new crane. Date: August 15, 2012 Contractor: Midwest Electric Incboeing West BldgPermit type: Electrical | Permit status: Closed | Completion date: January 14, 2013 | Current use: Commercial | Permit id: Bld2012-06055 | |||||
SCORE 64 Construction of new assembly line requiring four (4) new electrical panels and associated wiring to new equipment. Electrical work as per scope of bld2012-03849. Date: September 14, 2012 Contractor: Skyline Electric Companyboeing Assembly LinePermit type: Electrical | Permit status: Closed | Completion date: June 13, 2013 | Current use: Commercial | Permit id: Bld2012-06821 | |||||
SCORE 64 Fire alarm upgrade to boeing paint booth Date: November 2, 2012 Contractor: Fire Protection Servicesboeing Paint BoothPermit type: Low voltage | Permit status: Closed | Completion date: January 14, 2013 | Current use: Commercial | Permit id: Bld2012-08158 | |||||
SCORE 59 1 roof mounted air handler, 4 radiant heaters, 3 roof mounted exhaust fans, 1 elec unit heater, ductwork Date: December 17, 2012Permit type: Mechanical | Permit status: Closed | Completion date: January 14, 2013 | Current use: Commercial | Permit id: Bld2012-09180 | |||||
SCORE 59 Install new paint facility at boeing Date: December 21, 2012Permit type: Mechanical | Permit status: Closed | Completion date: January 14, 2013 | Current use: Commercial | Permit id: Bld2012-09285 | |||||
SCORE 64 Minimum electrical up to 1600. Date: March 14, 2013 Contractor: Phillip Brady ElectricboeingPermit type: Electrical | Permit status: Closed | Completion date: March 21, 2013 | Current use: Commercial | Permit id: Bld2013-01479 | |||||
SCORE 59 Relocate existing canopy on new footings & flatwork, no elec plmbg mech work k. A. A. M. Date: November 5, 2013Permit status: Closed | Completion date: March 28, 2014 | Current use: Commercial | Permit id: Bld2013-08205 | |||||
SCORE 64 Elec work for pavilion project Date: November 21, 2013Permit type: Electrical | Permit status: Closed | Completion date: April 1, 2014 | Current use: Commercial | Permit id: Bld2013-08676 | |||||
SCORE 100 Electrical permit, job bid 20,000. Not in conjunction with canopy. Date: January 21, 2014 Contractor: Skyline Electric CompanyPermit type: Electrical | Permit status: Inspections | Completion date: January 21, 2014 | Current use: Commercial | Permit id: Bld2014-00377 | |||||
SCORE 64 Providing power and control wiring for automation of pain booth Date: June 18, 2014 Contractor: Skyline Electric Companyboeing Paint BoothPermit type: Electrical | Permit status: Closed | Completion date: October 23, 2014 | Current use: Commercial | Permit id: Bld2014-04274 | |||||
SCORE 64 New shelving installation at boeing air port pain mixing room Date: August 5, 2014Permit status: Inspections | Completion date: October 14, 2014 | Current use: Commercial | Permit id: Bld2014-05599 | |||||
SCORE 59 Water sampling pit w ejector Date: January 26, 2015Permit status: Inspections | Completion date: January 26, 2015 | Current use: Commercial | Permit id: Bld2015-00534 | |||||
SCORE 59 Installation of pallet racking @ slc boeing airport south receiving bld. Installation details: - location: boeing airport south receiving bld storage area. Install three sections of pallet racking (end to end). (approx 24ft total length) - utilize existing boeing pallet racking, step beams (108" length & 60" length) 3,0 lb shelf capacity or equivalent. Each section: approx 42" from floor to bottom of first beam, then 3 rows with approx 36" opening between each row. - utilize existing boeing wire deck (2) per pallet shelf. - new supplied (4) ea. Pallet racking uprights #rtfbg042144bp0113xbvg. 42" deep x 12ft tall with extra bracing. - new supplied anchors for attaching pallet racking to the floor as per engineered specs. - new supplied shelf weight capacities stickers installed centered on every pallet shelf location front & back. - includes all equipment & labor to install the above mechanical equipment. - includes picking up existing racking parts from wj boeing. Date: May 12, 2015Permit status: In for review | Completion date: August 3, 2015 | Current use: Commercial | Permit id: Bld2015-03337 |