Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning/use permit Date: July 28, 2016 Client: B2 Front Hope Lp | Permit status: Completed | Permit id: 704869 | |||||
New construction permit Date: July 28, 2016 Client: B2 Front Hope Lp | Permit status: Active | Permit id: 704842 | |||||
Suppression permit Date: September 15, 2016 Client: B2 Front Hope Lp | Permit status: Active | Permit id: 720047 | |||||
Plumbing permit Date: September 19, 2016 Client: B2 Front Hope Lp | Permit status: Active | Permit id: 716611 | |||||
Electrical permit Date: December 30, 2016 Client: Bassal M Hayaty | Permit status: Active | Permit id: 739732 | |||||
SCORE 100 Install 4 amp main service, 4 gang meter, install allwiring throughout mixed use building ( 2 apartments & 1 office). As per 2008 nec. Install fire alarm systems throughout. As per nfpa 72. (east district)(3) sets of drawings submitted. (4) pages per set. Bulding permit #704842 Date: December 30, 2016 Contractor: Baldwin Electrical Const Llc Permit type: Electrical permit | Permit status: Completed | Completion date: March 30, 2017 | Permit id: 739732 | |||||
Plumbing permit Date: October 12, 2016 Client: B2 Front Hope Lp | Permit status: Completed | Permit id: 728631 | |||||
Administrative permit Date: January 19, 2017 Client: B2 Front Hope Lp | Permit status: Active | Permit id: 744273 | |||||
Use permit Date: January 17, 2017 Client: B2 Front Hope Lp | Permit status: Completed | Permit id: 750836 | |||||
Mechanical permit Date: October 5, 2016 Client: B2 Front Hope Lp | Permit status: Active | Permit id: 727208 | |||||
Suppression permit Date: September 15, 2016 Client: B2 Front Hope Lp | Permit status: Active | Permit id: 720047 | |||||
New construction permit Date: July 28, 2016 Client: B2 Front Hope Lp | Permit status: Active | Permit id: 704842 | |||||
Zoning use permit Date: July 28, 2016 Client: B2 Front Hope Lp | Permit status: Completed | Permit id: 704869 | |||||
SCORE 89 Install (3) hvac systems with ductwork. (mixed-use) Date: October 5, 2016 Contractor: Alkaun Co Client: B2 Front Hope Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 30, 2017 | Permit id: 727208 | |||||
New 4 story mixed use building on vacant lot. Commercial 1st floor in front, (2) residential units (1) at rear of 1st floor, basement and 2nd floor, ( at 3rd & 4th floors. Date: July 28, 2016 Client: B2 Front Hope Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 28, 2016 | Permit id: 704869 | |||||
SCORE 89 For the installation of a 2-1 2 inch fire service line for an automatic fire suppression sprinkler system with a backflow prevention assembly in accordance with nfpa 13 & 14 Date: September 15, 2016 Contractor: Aqueduct Fire Protection Client: B2 Front Hope Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: March 30, 2017 | Permit id: 720047 | |||||
For the erection of an attached structure with a roof deck and pilot house as per plans; used as vacant commercial space on first floor (use registration & co required prior to occupancy) with two-family dwelling above, separate permits required for all mechanical, electrical, plumbing, and fire suppression work (building to be fully sprinklered with nfpa 13). Date: July 28, 2016 Client: B2 Front Hope Lp | Permit type: New construction permit | Permit status: Completed | Completion date: March 30, 2017 | Permit id: 704842 | |||||
SCORE 79 Lateral,curb trap,fai and 1. 5 water service pa20162772318 self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: October 12, 2016 Contractor: Dzielinski Plumbing And Heating Client: B2 Front Hope Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 22, 2016 | Permit id: 728631 | |||||
To amend previously issued new construction permit ap#704842 to add new non-load bearing partitions for new office tenant on the first floor, as per plans; separate permits required for any and all mechanical, electrical, plumbing, and fire suppression work; building to be fully sprinklered with nfpa 13; no signs on this permit; no other work on this permit. Date: January 19, 2017 Client: B2 Front Hope Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 30, 2017 | Permit id: 744273 | |||||
SCORE 100 First floor comeercial space for use as business and professional Date: January 17, 2017 Contractor: Green Tree Group Contracting Client: B2 Front Hope Lp | Permit type: Use permit | Permit status: Completed | Completion date: January 17, 2017 | Permit id: 750836 | |||||
Temporary certificate of occupancy for the 2 (two) residential units only. Date: March 9, 2017 Client: B2 Front Hope Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: March 9, 2017 | Permit id: 765361 | |||||
SCORE 100 New construction: interior plumbing;roof deck and pilot house ;vacant commercial space on first floor with two-family dwelling above - the installation will comply with the philadephia plubming code 2004 Date: September 19, 2016 Contractor: Murray Resnick Client: B2 Front Hope Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 30, 2017 | Permit id: 716611 |