Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing a 3. 575kw photovoltaic system on the roof Date: January 8, 2015 Contractor: A And R Solar Permit type: Electrical | Permit status: Permit closed | Completion date: January 13, 2015 | Expiration date: January 8, 2016 | Current use: Single family / duplex | Permit id: 6453741 | |||||
SCORE 98 Replace 2 amp panel with new 2 amp panel. Install new grounding and bonding. Reconnect existing circuits only. Date: December 1, 2014 Contractor: A C Electric Service Permit type: Electrical | Permit status: Permit closed | Completion date: December 4, 2014 | Expiration date: December 1, 2015 | Current use: Single family / duplex | Permit id: 6448574 |