ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Apt 1: as per the requirement contract with hpd, provide and install 2 window guards throughout entire apartment. Remove all work related debris. Date: February 21, 2014Permit type: Gc | Permit id: Ee16915 | |||||
(apt. #5) at bathroom trace, locate and repair leak at the bathroom ceiling from above. Replace defective toilet, shower body and the basin with bot Date: October 27, 2003Permit type: Gc | Permit id: E407096 | |||||
(apt. 5b) demolish kitchen and bathroom ceiling approx 115 sq. Ft. Supply aind install water resistant sheetrock, tape, compound (3) coats, prime an Date: October 27, 2003Permit type: Gc | Permit id: E407288 | |||||
Apartment #5: trace, locate and repair leak coming from apartment above apt. #5f bathroom. Restoration included. Install flushometer kit to include Date: August 8, 2003Permit type: Plumb | Permit id: E402769 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: March 23, 2011Permit type: Delead | Permit id: Eb26092 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 23, 2011Permit type: Delead | Permit id: Eb34982 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: December 3, 2012Permit type: Delead | Permit id: Ed11103 | |||||
SCORE 59 Plumbing Date: December 31, 1998 Contractor: Dual Fuel Plumbing And HetingPermit status: Permit issued | Permit id: 30081328901 | |||||
Replace 1 broken bottom sash glass window at 2nd floor hallway ( wire glass 39x30). Remove work related debris. Field measurement for actual siz Date: November 19, 2001Permit type: Gc | Permit id: E208445 | |||||
At bldg 2nd to 3rd story public hall stairs replace ( 1 ) broken marble tread nosing to match existing 16th from bottom up. ( 3rd story landing marb Date: May 23, 2011Permit type: Gc | Permit id: Eb31875 | |||||
Apt 23: provide and install (1) window guard and repair (2) window guards throughout entire apartment. Date: October 25, 2011Permit type: Gc | Permit id: Ec10638 | |||||
Public hall: as per the requirement contract with hpd, provide and install/repair window guards at public hall 3rd story. Remove all work related Date: August 20, 2013Permit type: Gc | Permit id: Ee04349 | |||||
Apt 16: provide and install/ repair window guards throughout apartment. Date: January 15, 2014 Value: $12Permit type: Gc | Permit id: Ee14034 | |||||
Public hall . Installed new w/g as follows. # one at 3. 5 fl and installed new stops at 1st & 2nd floor. Work is completed. Date: October 26, 2009 Value: $61Permit type: Gc | Permit id: Ea14309 | |||||
Apt 13) kit- install window stops, at bathroom install window guard Date: December 5, 2007 Value: $76Permit type: Gc | Permit id: E814113 | |||||
Apt ) at bathroom install window guard Date: December 5, 2007 Value: $62Permit type: Gc | Permit id: E814110 | |||||
3rd. Story-public hallway: re-install (1) window guard and stop Date: July 1, 2002 Value: $120Permit type: Gc | Permit id: E223118 | |||||
Apt. 21 bthrm: install 1 window guard and stop. Kit: repair window guards. Livrm: repair 1 window guard. Bdrm: repair 2 window guards. Date: November 23, 2001 Value: $248Permit type: Gc | Permit id: E209221 | |||||
SCORE 100 Date: December 31, 1998 Contractor: Ira FriedmanClient: John Blair | Client Address: 2666 Bedford Ave Bklyn Ny 11210 | Client Phone: (718) 859-0528 | Client Company: John Blair Properties | Permit status: Initial | Permit id: 300813289 | |||||
SCORE 100 Date: December 31, 1998 Contractor: Neal RudikoffClient: John Blair | Client Address: 2666 Bedford Ave Bklyn Ny 11210 | Client Phone: (718) 859-0528 | Client Company: John Blair Properties | Permit status: Initial | Permit id: 300813289 | |||||
Public hall . Installed new w g as follows. # one at 3. 5 fl and installed new stops at 1st & 2nd floor. Work is completed. Date: October 26, 2009 Value: $61Permit type: Gc | Permit id: Ea14309 | |||||
Apt 16: provide and install repair window guards throughout apartment. Date: January 15, 2014 Value: $12Permit type: Gc | Permit id: Ee14034 | |||||
Public hall: as per the requirement contract with hpd, provide and install repair window guards at public hall 3rd story. Remove all work related Date: August 20, 2013Permit type: Gc | Permit id: Ee04349 | |||||
Access warrant attached apt 16: as per the requirement contract with hpd, provide and insta Date: January 16, 2014Permit type: Gc | Permit id: Ee12339 | |||||
Apt 16: as per the requirement contract with hpd, provide and install 3 window guards throughout entire apartment. Remove all work related debris Date: August 20, 2013Permit type: Gc | Permit id: Ee04350 | |||||
Access warrant attached apt 16: as per the requirement contract with hpd, provide and insta Date: January 16, 2014Permit type: Gc | Permit id: Ee12339 |