Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Lot 12 mhp Date: June 14, 2011 Permit status: Closed | Permit id: 11-02509 | |||||
SCORE 69 Lot 12 mhp Date: June 14, 2011 Contractor: Mountain Mobiles Llc Client: Lot 12 Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-02509 | Parcel: 94652 | |||||
SCORE 99 Lot 12 mhp Date: June 14, 2011 Contractor: Atlantic South East Electric I Client: Lot 12 Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-02509 | Parcel: 94652 | |||||
May 6, 2011 1:00:49 pm scarver. Mmoving used mobile home from 1998, renovating with carpet and electric;scc; june 14, 2011 10:16:05 am kneel. Mobile home placement, renovating with carpet and electric; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommended that water lines be insulated with heat tape. D Permit type: Permits - historical | Permit status: Closed | Permit id: 11-02509 | Parcel: 94652 | |||||
May 6, 2011 1:00:49 pm scarver. Mmoving used mobile home from 1998, renovating with carpet and electric;scc; june 14, 2011 10:16:05 am kneel. Mobile home placement, renovating with carpet and electric; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommended that water lines be insulated with heat tape. D Date: June 14, 2011 Permit type: Permits - historical | Permit status: Closed | Permit id: 11-02509 | Parcel: 94652 |