Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 77 Addition of two pole supported lighted entrance signs Applicant: Cannella John | Permit status: Permisud | Permit id: 0003090041 | |||||
SCORE 93 Demolition Date: April 24, 2001 Contractor: Aman Environmental Construction Inc Applicant: Laurin Brian | Permit status: Permisud | Permit id: 0104240055 | |||||
SCORE 86 Provide ada and structural repairs. Engineer: Don Lee | Applicant: Galang Oscar | Permit status: Permisud | Expiration date: December 26, 2000 | Permit id: 2280055 | |||||
SCORE 56 State approved modular office building job #p01bn26a Engineer: Ken Agharokh And Associates | Applicant: Rynn Dan | Permit status: Permisud | Expiration date: October 28, 2000 | Permit id: 3080041 | |||||
SCORE 93 Retaining wall Engineer: Hok And Lbl* | Applicant: Rynn Dan | Permit status: Permisud | Expiration date: October 1, 2001 | Permit id: 9250073 | |||||
SCORE 98 Non-structural repair of cracks using epoxy injection Engineer: Integrated Design Services | Applicant: Dewey Cliff | Permit status: Permisud | Expiration date: May 4, 2002 | Permit id: 111010059 | |||||
SCORE 56 Repair cracks and add shearwalls Engineer: Jc Chang And Associates* | Applicant: Boyd John | Permit status: Permisud | Expiration date: May 3, 2003 | Permit id: 211040063 | |||||
Ti laundry room to (16) offices Date: September 20, 2012 Value: $145,000 Engineer: Julio Ribeiro | Applicant: Same As Owner | Permit status: Finaled | Completion date: October 30, 2013 | Expiration date: September 20, 2013 | Permit id: 1110270028 | |||||
SCORE 56 Job no. P01an16a. Install (2) 200a, (1) 600a service panels (77) branch circuits, (112) lighting outlets, and (1) transformers, 150kva. Date: December 21, 2000 Contractor: F. H. Paschen S. N. Nelsen Engineer: Storms And Lowe | Applicant: Mohammad Farzan Oscar | Permit status: Permisud | Expiration date: June 20, 2001 | Permit id: 12210020 | |||||
SCORE 70 Install (1) 100a, (3) 400a service panels, (2) transformers, 75kva and (1) transformer, 225kva. No fee permit per lloyd moore. Date: June 5, 2001 Contractor: Aman Environmental Engineer: Lockwood, Hok And Lbl | Applicant: Mohammad Farzan Oscar | Permit status: Permisud | Expiration date: December 2, 2001 | Permit id: 104040037 | |||||
SCORE 70 Install (1) 225a service panel, (1) exhaust fan, etc. Date: May 15, 2002 Contractor: Aman Environmental Engineer: M-E Engineers, Inc. | Applicant: Mohammad Farzan | Permit status: Permisud | Expiration date: November 11, 2002 | Permit id: 205150020 | |||||
SCORE 98 Job #p01an16a. Add new exhaust fan and (1) branch circuit. Date: January 7, 2003 Contractor: Athena Engineering Inc Applicant: Dan Rynn | Permit status: Permisud | Expiration date: July 6, 2003 | Permit id: 301070012 | |||||
SCORE 93 Mass excavation Date: April 4, 2001 Contractor: Aman Environmental Construction Inc Engineer: Kpff | Applicant: Hok + Lbl | Permit status: Permisud | Expiration date: October 1, 2001 | Permit id: 104040004 | |||||
SCORE 98 Job no. P01an16a. Add new exhaust fan and transfer grilles and ducting. Date: November 26, 2002 Contractor: Athena Engineering Inc Applicant: Dan Rynn | Permit status: Permisud | Expiration date: May 25, 2003 | Permit id: 211260016 | |||||
SCORE 59 Underground domestic water lines. Job#5394 Date: May 21, 2001 Contractor: 6269674287 Aman Construction Co Applicant: Brad Bolger | Permit status: Permisud | Expiration date: November 17, 2001 | Permit id: 105210038 | |||||
SCORE 74 5 concrete retaining wall Engineer: Hok And Lbl Associated Architects* | Applicant: Hok & Lbl | Permit status: Permisud | Expiration date: February 28, 2004 | Permit id: 302270064 | |||||
SCORE 74 7 story op bldg for med. Ctr & marengo street bridge Engineer: Hok And Lbl* | Applicant: Rynn Dan | Permit status: Finaled | Completion date: June 30, 2008 | Expiration date: February 28, 2004 | Permit id: 302270065 | |||||
SCORE 74 Shoring for inpatient building Engineer: Hok And Lbl Associated Architects* | Applicant: Madda Joe | Permit status: Permisud | Expiration date: February 28, 2004 | Permit id: 302270066 | |||||
SCORE 74 Shoring for outpatient building Engineer: Hok And Lbl Associated Architects* | Applicant: Madda Joe | Permit status: Permisud | Expiration date: February 28, 2004 | Permit id: 302270067 | |||||
SCORE 74 Shoring for central plant Engineer: Hok And Lbl Associated Architects* | Applicant: Madda Joe | Permit status: Permisud | Expiration date: February 28, 2004 | Permit id: 302270068 | |||||
SCORE 74 2 free standing passenger drop-off canopies Engineer: Hok And Lbl Associated Architects* | Applicant: Hok & Lbl | Permit status: Permisud | Expiration date: February 28, 2004 | Permit id: 302270070 | |||||
SCORE 74 Site development around new lac usc mc replacement project b uildings - structural lan check of landscape, structures ga rden and retaining wall. Engineer: Hok And Lbl* | Applicant: Matta Joe | Permit status: Permisud | Expiration date: February 28, 2004 | Permit id: 303050019 | |||||
SCORE 86 Earthquake retrofit - remove / replace shear walls add shot crete to damage walls. Epoxy inject cracks Engineer: F Webb Architects | Applicant: Boyd John | Permit status: Permisud | Expiration date: February 6, 2005 | Permit id: 304230045 | |||||
SCORE 62 Data wall display Applicant: Collins Micheal | Permit status: Finaled | Completion date: April 10, 2008 | Expiration date: September 6, 2008 | Permit id: 803100040 | |||||
SCORE 95 Conversion of infusion area to an er observation Applicant: Dadmehr Pansa | Permit status: Finaled | Completion date: November 4, 2008 | Expiration date: February 9, 2009 | Permit id: 807210068 | |||||
SCORE 64 T. I on 3rd floor, new non-bearing partition walls Engineer: M.Haraghi Wolcott Architecture | Applicant: Agcaoili Bernadette | Permit status: Finaled | Completion date: September 29, 2011 | Expiration date: November 30, 2009 | Permit id: 901280047 | |||||
Renovation of existing lobby & waiting room Date: April 7, 2011 Value: $250,000 Engineer: Nazanin Zarkes La Canada Design Group | Applicant: Same As Owner | Permit status: Finaled | Completion date: May 23, 2012 | Expiration date: April 6, 2012 | Permit id: 1011040076 | |||||
SCORE 56 Provide structural support system installation for childcare play equipment in outpatient building Engineer: Ming Yang Yeh Architectural Engineering Division | Applicant: Geri Fineroff | Permit status: Finaled | Completion date: July 8, 2011 | Expiration date: January 25, 2012 | Permit id: 1012290048 | |||||
SCORE 64 Installation of 2 boiler systems and demo 3 existing Engineer: Plump Engineering, Inc. | Applicant: Conan Yates | Permit status: Finaled | Completion date: March 19, 2013 | Expiration date: May 10, 2013 | Permit id: 1203010052 | |||||
SCORE 88 T. I. For wellness center on 1st flr of hospital bldg(39,0 sqft) & t. I. For ymca in bldg #837 (2,712 sqft) Engineer: Richard L. Gooding | Applicant: Robert Peery | Permit status: Finaled | Completion date: September 4, 2014 | Expiration date: April 23, 2014 | Permit id: 1206280076 | |||||
SCORE 98 Chiller plant renovation:replace chillers,pumps,& fan coil unit. Install new exhaust fan & refrigerant monitoring system Engineer: Trevor Nelson | Applicant: Hratch Arezouyan Nelson | Permit status: Finaled | Completion date: September 18, 2013 | Expiration date: April 24, 2014 | Permit id: 1302200056 | |||||
SCORE 62 Demo 5 office trailers Applicant: Sarfaraz Khan | Permit status: Permisud | Expiration date: May 20, 2014 | Permit id: 1305200074 | |||||
SCORE 59 Demo 5 office trailers: child care, #22, #21, t-25, & t-25a Applicant: Stephen Ugwunna Nwaiwu | Permit status: Finaled | Completion date: June 3, 2014 | Expiration date: June 27, 2014 | Permit id: 1306270048 | |||||
SCORE 59 Demo of existing atm enclosure & bus shelter Applicant: Stephen Ugwunna Nwaiwu | Permit status: Finaled | Completion date: June 3, 2014 | Expiration date: July 11, 2014 | Permit id: 1307110084 | |||||
SCORE 59 Add a new wet-pipe sprinkler system to the 35,8 sq ft ti of the main building 1st flr for medical office use. Total 5 sprinkler heads. Applicant: Derek Discoll | Permit status: Finaled | Completion date: February 19, 2014 | Expiration date: November 26, 2014 | Permit id: 1311260026 | |||||
SCORE 88 Emergency vehicle access lane on the south edge(75 sqft), install of exercise & play equipment Engineer: David Evans And Associates, Inc. | Applicant: Daniel Villalobos | Permit status: Finaled | Completion date: October 6, 2014 | Expiration date: March 20, 2015 | Permit id: 1402120007 | |||||
SCORE 89 Replacement of (e) electrical generator set pouring pad overlay Applicant: Pat Carolan | Permit status: Finaled | Completion date: September 16, 2014 | Expiration date: April 21, 2015 | Permit id: 1402180057 | |||||
SCORE 88 New decorative gate Engineer: David Evans And Associates, Inc. | Applicant: Daniel Villalobos | Permit status: Finaled | Completion date: September 16, 2014 | Expiration date: March 20, 2015 | Permit id: 1403040067 | |||||
SCORE 95 Replacement of outdoor structural platform for new chiller, replace one crac unit & install one new crac unit for back- up Engineer: J. C. Chang And Associates | Applicant: John Choi | Permit status: Finaled | Completion date: July 20, 2015 | Expiration date: March 18, 2016 | Permit id: 1501290017 | |||||
SCORE 100 Electrical system for 324,0 sq ft outpatient bldg. Job no. P4711d Date: April 30, 2003 Contractor: Sasco Electric Engineer: M-E Engineers | Applicant: Ryan Wantz | Permit status: Finaled | Completion date: September 29, 2011 | Expiration date: October 27, 2003 | Permit id: 304300024 | |||||
SCORE 62 Electrical Date: March 10, 2008 Contractor: Facilities Management Applicant: Collins Micheal | Permit status: Finaled | Completion date: April 10, 2008 | Expiration date: September 6, 2008 | Permit id: 803100034 | |||||
SCORE 95 Conversion of infusion area to an er observation Date: August 13, 2008 Contractor: Mtm Construction Applicant: Dadmehr Pansa | Permit status: Finaled | Completion date: November 4, 2008 | Expiration date: February 9, 2009 | Permit id: 808130001 | |||||
SCORE 64 Electrical for ti on third floor-new nonbearing partition wa lls Date: June 3, 2009 Contractor: Ruben A Franco Engineer: B.Sedighi Syska Hennessy | Applicant: Agcaoili Bernadette | Permit status: Finaled | Completion date: September 19, 2011 | Expiration date: November 30, 2009 | Permit id: 902120023 | |||||
El for renovation of existing lobby & waiting room Date: April 7, 2011 Engineer: Nazanin Zarkes La Canada Design Group | Applicant: Same As Owner | Permit status: Finaled | Completion date: May 23, 2012 | Expiration date: April 6, 2012 | Permit id: 1011040036 | |||||
Ti laundry room to (16) offices Date: October 11, 2012 Engineer: Julio Ribeiro | Applicant: Same As Owner | Permit status: Finaled | Completion date: October 31, 2013 | Expiration date: October 11, 2013 | Permit id: 1110270009 | |||||
SCORE 64 Electrical for 2 boiler systems and demo 3 existing Date: May 10, 2012 Contractor: R F Mac Donald Co Engineer: Plump Engineering, Inc. | Applicant: Conan Yates | Permit status: Finaled | Completion date: March 19, 2013 | Expiration date: May 10, 2013 | Permit id: 1205010047 | |||||
SCORE 98 El for t. I. For wellness center on 1st floor of hospital bldg (39,0 sqft) & t. I. For ymca in bldg #837 (2,712 sqft) Date: October 3, 2013 Contractor: Sunwest Electric Inc Engineer: Richard L. Gooding | Applicant: Culqui Radames | Permit status: Finaled | Completion date: September 4, 2014 | Expiration date: October 3, 2014 | Permit id: 1206280058 | |||||
SCORE 100 El for chiller plant renovation:replace chillers,pumps,& fan coil. Install new exhaust fan & refrigerant monitoring system Date: April 24, 2013 Contractor: A1 Electric Engineer: Trevor Nelson | Applicant: Scott Thomas Pieper Nelson | Permit status: Finaled | Completion date: September 18, 2013 | Expiration date: April 24, 2014 | Permit id: 1302200048 | |||||
SCORE 72 El for 3 vds added for cooling tower fan motors Date: February 27, 2013 Contractor: A1 Electric Service Co Engineer: Fba Engineering | Applicant: Scott Pieper | Permit status: Finaled | Completion date: September 18, 2013 | Expiration date: February 27, 2014 | Permit id: 1302270022 | |||||
SCORE 89 Replace diesel generator 6 amp panel Date: April 21, 2014 Contractor: Trane U S Inc Applicant: Pat Carolan | Permit status: Finaled | Completion date: September 16, 2014 | Expiration date: April 21, 2015 | Permit id: 1402180017 | |||||
SCORE 88 Courtyard/landscape lighting improvement Date: June 23, 2014 Contractor: K C S West Inc Engineer: Innovative Engineering Group | Applicant: Robert Peery | Permit status: Finaled | Completion date: October 7, 2014 | Expiration date: June 23, 2015 | Permit id: 1404010038 | |||||
SCORE 95 El for chillers & 2 crac units Date: March 19, 2015 Contractor: Mackone Development Inc Engineer: J. C. Chang And Associates | Applicant: John Choi | Permit status: Finaled | Completion date: July 30, 2015 | Expiration date: March 18, 2016 | Permit id: 1501290011 | |||||
SCORE 74 Grading for four distinct buildings - lac usc replacement pr oject. Date: March 5, 2003 Contractor: Mccarthy Clark Hunt Engineer: Kpff | Applicant: Hok + Lbl | Permit status: Permisud | Expiration date: September 1, 2003 | Permit id: 302270004 | |||||
SCORE 88 9,431 sqft of landscaping Date: June 24, 2014 Contractor: K C S West Inc Engineer: David Evans And Associates, Inc. | Applicant: Daniel Villalobos | Permit status: Finaled | Completion date: October 6, 2014 | Expiration date: June 24, 2015 | Permit id: 1406190002 | |||||
SCORE 100 Mechanical system for 324,0 sq ft outpatient bldg. Date: April 30, 2003 Contractor: Southland Industries Engineer: Hok And Lbl Associated Architects* | Applicant: Wantz Ryan | Permit status: Permisud | Expiration date: October 27, 2003 | Permit id: 304300001 | |||||
SCORE 64 Mechanica for ti 3rd flr-non bearing partition walls Date: June 3, 2009 Contractor: Ruben A Franco Engineer: Syska Hennessy Group | Applicant: Agcaoili Bernadette | Permit status: Finaled | Completion date: September 29, 2011 | Expiration date: November 30, 2009 | Permit id: 902120014 | |||||
Me for renovation of existing lobby & waiting room Date: April 7, 2011 Engineer: Nazanin Zarkes La Canada Design Group | Applicant: Same As Owner | Permit status: Finaled | Completion date: March 29, 2012 | Expiration date: April 6, 2012 | Permit id: 1011040022 | |||||
Mechanical for ti laundry room to (16) offices Date: September 20, 2012 Engineer: Julio Ribeiro | Permit status: Finaled | Completion date: October 30, 2013 | Expiration date: September 20, 2013 | Permit id: 1110270012 | |||||
SCORE 64 Mechanical for 2 boiler systems and demo 3 existing Date: May 10, 2012 Contractor: R F Mac Donald Co Engineer: Plump Engineering, Inc. | Applicant: Conan Yates | Permit status: Finaled | Completion date: March 19, 2013 | Expiration date: May 10, 2013 | Permit id: 1205010021 | |||||
SCORE 98 Me for t. I. For wellness center on 1st floor of hospital bldg (39,0 sqft) & t. I. For ymca in bldg #837 (2,712 sqft) Date: October 7, 2013 Contractor: Control Air Conditioning Engineer: Richard L. Gooding | Applicant: Michele Prevost | Permit status: Finaled | Completion date: August 28, 2014 | Expiration date: October 7, 2014 | Permit id: 1206280030 | |||||
SCORE 98 Me for chiller plant renovation:replace chillers,pumps,& fan coil. Install new exhaust fan & refrigerant monitoring system Date: April 24, 2013 Contractor: Johnson Controls Engineer: Trevor Nelson | Applicant: Hratch Arezouyan | Permit status: Finaled | Completion date: September 18, 2013 | Expiration date: April 24, 2014 | Permit id: 1302200026 | |||||
SCORE 95 Replace existing chiller & 1 crac units 7 install 1 new crac unit Date: March 19, 2015 Contractor: Mackone Development Inc Engineer: J. C. Chang And Associates | Applicant: John Choi | Permit status: Finaled | Completion date: July 30, 2015 | Expiration date: March 18, 2016 | Permit id: 1501290002 | |||||
SCORE 59 Plumbing system for 324,0 sq ft outpatient bldg. Date: April 30, 2003 Contractor: Pan Pacific Plumbing Engineer: Hok And Lbl Associated Architects* | Applicant: Wantz Ryan | Permit status: Permisud | Expiration date: October 27, 2003 | Permit id: 304300001 | |||||
SCORE 64 Plumbing for ti on 3rd flr. New nonbearing partition walls Date: June 3, 2009 Contractor: Ruben A Franco Engineer: M.Naraghi Syska Hennessy | Applicant: Agcaoili Bernadette | Permit status: Finaled | Completion date: September 19, 2011 | Expiration date: November 30, 2009 | Permit id: 902120017 | |||||
SCORE 64 Plumbing for 2 boiler systems and demo 3 existing Date: May 10, 2012 Contractor: R F Mac Donald Co Engineer: Plump Engineering, Inc. | Applicant: Conan Yates | Permit status: Finaled | Completion date: March 19, 2013 | Expiration date: May 10, 2013 | Permit id: 1205010026 | |||||
SCORE 99 Pl for t. I. For wellness center on 1st floor of hospital bldg (39,0 sqft) & t. I. For ymca in bldg #837 (2,712 sqft) Date: September 17, 2013 Contractor: Muirchase Plumbing Co Engineer: Richard L. Gooding | Applicant: Cody Andrew Katz | Permit status: Finaled | Completion date: August 28, 2014 | Expiration date: September 17, 2014 | Permit id: 1206280033 | |||||
SCORE 56 Sewer system for 324,0 sq ft outpatient bldg. Date: April 30, 2003 Contractor: 9494779958 Pan Pacific Plumbing Engineer: Hok And Lbl Associated Architects* | Applicant: Wantz Ryan | Permit status: Permisud | Expiration date: October 27, 2003 | Permit id: 304300001 | |||||
SCORE 56 Provide ada and structural repairs. Engineer: Don Lee | Applicant: Galang Oscar | Permit status: Permisud | Expiration date: December 26, 2000 | Permit id: 2280055 | |||||
SCORE 56 Job no. P01an16a. Install (2) 200a, (1) 600a service panels (77) branch circuits, (112) lighting outlets, and (1) transformers, 150kva. Date: December 21, 2000 Contractor: F. H. Paschen, S. N. Nelsen Engineer: Storms And Lowe | Applicant: Mohammad Farzan Oscar | Permit status: Permisud | Expiration date: June 20, 2001 | Permit id: 12210020 | |||||
SCORE 95 Job #p01an16a. Add new exhaust fan and (1) branch circuit. Date: January 7, 2003 Contractor: Athena Engineering, Inc Applicant: Dan Rynn | Permit status: Permisud | Expiration date: July 6, 2003 | Permit id: 301070012 | |||||
SCORE 95 Job no. P01an16a. Add new exhaust fan and transfer grilles and ducting. Date: November 26, 2002 Contractor: Athena Engineering, Inc Applicant: Dan Rynn | Permit status: Permisud | Expiration date: May 25, 2003 | Permit id: 211260016 | |||||
SCORE 74 5 concrete retaining wall Engineer: Hok And Lbl Associated Architects* | Applicant: Hok & Lbl | Permit status: Permisud | Expiration date: February 28, 2004 | Permit id: 302270064 | |||||
SCORE 74 7 story op bldg for med. Ctr & marengo street bridge Engineer: Hok And Lbl* | Applicant: Rynn Dan | Permit status: Finaled | Completion date: June 30, 2008 | Expiration date: February 28, 2004 | Permit id: 302270065 | |||||
SCORE 74 Shoring for inpatient building Engineer: Hok And Lbl Associated Architects* | Applicant: Madda Joe | Permit status: Permisud | Expiration date: February 28, 2004 | Permit id: 302270066 | |||||
SCORE 74 Shoring for outpatient building Engineer: Hok And Lbl Associated Architects* | Applicant: Madda Joe | Permit status: Permisud | Expiration date: February 28, 2004 | Permit id: 302270067 | |||||
SCORE 74 Shoring for central plant Engineer: Hok And Lbl Associated Architects* | Applicant: Madda Joe | Permit status: Permisud | Expiration date: February 28, 2004 | Permit id: 302270068 | |||||
SCORE 74 2 free standing passenger drop-off canopies Engineer: Hok And Lbl Associated Architects* | Applicant: Hok & Lbl | Permit status: Permisud | Expiration date: February 28, 2004 | Permit id: 302270070 | |||||
SCORE 74 Site development around new lac usc mc replacement project b uildings - structural lan check of landscape, structures ga rden and retaining wall. Engineer: Hok And Lbl* | Applicant: Matta Joe | Permit status: Permisud | Expiration date: February 28, 2004 | Permit id: 303050019 | |||||
SCORE 82 Earthquake retrofit - remove replace shear walls add shot crete to damage walls. Epoxy inject cracks Engineer: F Webb Architects | Applicant: Boyd John | Permit status: Permisud | Expiration date: February 6, 2005 | Permit id: 304230045 | |||||
SCORE 98 Chiller plant renovation:replace chillers,pumps,& fan coil unit. Install new exhaust fan & refrigerant monitoring system Engineer: Trevor Nelson | Applicant: Hratch Arezouyan Nelson | Permit status: Finaled | Completion date: September 18, 2013 | Expiration date: April 24, 2014 | Permit id: 1302200056 | |||||
SCORE 82 Emergency vehicle access lane on the south edge(75 sqft), install of exercise & play equipment Engineer: David Evans And Associates, Inc. | Applicant: Daniel Villalobos | Permit status: Finaled | Completion date: October 6, 2014 | Expiration date: March 20, 2015 | Permit id: 1402120007 | |||||
SCORE 67 Replacement of (e) electrical generator set pouring pad overlay Applicant: Pat Carolan | Permit status: Finaled | Completion date: September 16, 2014 | Expiration date: April 21, 2015 | Permit id: 1402180057 | |||||
SCORE 82 New decorative gate Engineer: David Evans And Associates, Inc. | Applicant: Daniel Villalobos | Permit status: Finaled | Completion date: September 16, 2014 | Expiration date: March 20, 2015 | Permit id: 1403040067 | |||||
SCORE 100 Replacement of outdoor structural platform for new chiller, replace one crac unit & install one new crac unit for back- up Engineer: J. C. Chang And Associates | Applicant: John Choi | Permit status: Finaled | Completion date: July 20, 2015 | Expiration date: March 18, 2016 | Permit id: 1501290017 | |||||
SCORE 85 El for t. I. For wellness center on 1st floor of hospital bldg (39,0 sqft) & t. I. For ymca in bldg #837 (2,712 sqft) Date: October 3, 2013 Contractor: Sunwest Electric, Inc Engineer: Richard L. Gooding | Applicant: Culqui Radames | Permit status: Finaled | Completion date: September 4, 2014 | Expiration date: October 3, 2014 | Permit id: 1206280058 | |||||
SCORE 67 Replace diesel generator 6 amp panel Date: April 21, 2014 Contractor: Trane U S, Inc Applicant: Pat Carolan | Permit status: Finaled | Completion date: September 16, 2014 | Expiration date: April 21, 2015 | Permit id: 1402180017 | |||||
SCORE 82 Courtyard landscape lighting improvement Date: June 23, 2014 Contractor: K C S West, Inc Engineer: Innovative Engineering Group | Applicant: Robert Peery | Permit status: Finaled | Completion date: October 7, 2014 | Expiration date: June 23, 2015 | Permit id: 1404010038 | |||||
SCORE 100 El for chillers & 2 crac units Date: March 19, 2015 Contractor: Mackone Development, Inc Engineer: J. C. Chang And Associates | Applicant: John Choi | Permit status: Finaled | Completion date: July 30, 2015 | Expiration date: March 18, 2016 | Permit id: 1501290011 | |||||
SCORE 74 Grading for four distinct buildings - lac usc replacement pr oject. Date: March 5, 2003 Contractor: Mccarthy, Clark, Hunt Engineer: Kpff | Applicant: Hok + Lbl | Permit status: Permisud | Expiration date: September 1, 2003 | Permit id: 302270004 | |||||
SCORE 82 9,431 sqft of landscaping Date: June 24, 2014 Contractor: K C S West, Inc Engineer: David Evans And Associates, Inc. | Applicant: Daniel Villalobos | Permit status: Finaled | Completion date: October 6, 2014 | Expiration date: June 24, 2015 | Permit id: 1406190002 | |||||
SCORE 98 Me for chiller plant renovation:replace chillers,pumps,& fan coil. Install new exhaust fan & refrigerant monitoring system Date: April 24, 2013 Contractor: Johnson Controls Engineer: Trevor Nelson | Applicant: Hratch Arezouyan | Permit status: Finaled | Completion date: September 18, 2013 | Expiration date: April 24, 2014 | Permit id: 1302200026 | |||||
SCORE 100 Replace existing chiller & 1 crac units 7 install 1 new crac unit Date: March 19, 2015 Contractor: Mackone Development, Inc Engineer: J. C. Chang And Associates | Applicant: John Choi | Permit status: Finaled | Completion date: July 30, 2015 | Expiration date: March 18, 2016 | Permit id: 1501290002 | |||||
SCORE 67 Addition of two pole supported lighted entrance signs Engineer: John Cannella* | Applicant: Cannella John | Permit status: Permisud | Expiration date: August 6, 2001 | Permit id: 3090041 | |||||
SCORE 70 Renovation of ambulance drop off/passenger waiting area Engineer: Hok | Applicant: Farzan Mohammad | Permit status: Permisud | Expiration date: October 20, 2002 | Permit id: 108220023 | |||||
SCORE 70 Renovation of ambulance drop off/passenger waiting area. Job#po 1bn26a Date: April 23, 2002 Contractor: Aman Environmental Engineer: Hok | Applicant: Farzan Mohammad | Permit status: Permisud | Expiration date: October 20, 2002 | Permit id: 204230019 | |||||
SCORE 59 Water piping > 3 inches, and drainage/vent piping, job #5394 Date: August 6, 2001 Contractor: 6269674287 Aman Construction Co Engineer: Hok, Lbl | Applicant: Mohammad Farzan | Permit status: Permisud | Expiration date: February 2, 2002 | Permit id: 108060025 | |||||
SCORE 70 Renovation of ambulance drop off/passenger waiting area job#po1bn26a Date: April 23, 2002 Contractor: Aman Environmental Engineer: Hok | Applicant: Farzan Mohammad | Permit status: Permisud | Expiration date: October 20, 2002 | Permit id: 204230035 | |||||
SCORE 56 Installation of lobby/ free standing atm machine t. I. Applicant: Jeff Fry | Permit status: Finaled | Completion date: December 17, 2008 | Expiration date: March 17, 2009 | Permit id: 808210038 | |||||
SCORE 86 New 60amp breaker to new voltage regulator in electrical room to new 100amp panel w/60amp breaker to existing equipment in room 1a315. Location is ground floor bldg "a". Date: September 21, 2015 Contractor: E H Butland Corp Engineer: Jesse Given Given Design Group | Applicant: Given Jesse | Permit status: Finaled | Completion date: October 15, 2015 | Expiration date: September 20, 2016 | Permit id: 1509140043 | |||||
SCORE 98 Install platform for 2 a c units telecom plaze on 1st floor & basement Engineer: Stv, Inc. | Applicant: Park Daniel | Permit status: Permisud | Expiration date: November 16, 2017 | Permit id: 1611150004 | |||||
SCORE 98 El for 2 new a c units Date: November 16, 2016 Contractor: Harry H Joh Construction, Inc Engineer: Stv, Inc. | Applicant: Park Daniel | Permit status: Permisud | Expiration date: November 16, 2017 | Permit id: 1611150007 | |||||
SCORE 98 Install 2 new a c units for telecom plaza on 1st floor & basement Date: November 16, 2016 Contractor: Harry H Joh Construction, Inc Engineer: Stv, Inc. | Applicant: Park Daniel | Permit status: Permisud | Expiration date: November 16, 2017 | Permit id: 1611150002 | |||||
SCORE 98 Replace existing steel stairs Engineer: Kim Caravalho Brandow And Johnston, Inc. | Applicant: Moon John | Permit status: Permisud | Expiration date: February 17, 2017 | Permit id: 1601280058 |