ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Zoning permit Date: February 12, 2015Client: North 7th Residences Llc | Permit status: Completed | Permit id: 589639 | |||||
Zoning permit Date: February 12, 2015Client: North 7th Residences Llc | Permit status: Completed | Permit id: 589639 | |||||
SCORE 82 Amend existing plumbing permit #6652 to show the drain, waste, vent and storm drainage material change from the approved cast iron to schedule pvc per standard astm d2665 and pvc drainage pattern fittings per standard astm d2466 Date: August 30, 2016 Contractor: Burnsies Plumbing LlcPermit type: Administrative permit | Permit status: Completed | Completion date: September 26, 2016 | Permit id: 718714 | |||||
SCORE 93 Plumbing construction throughout for a new (3)story (3)family dwelling including the 5" sanitary lateral & (3)3 4" water distribution lines - installation per the approved plans and the philadelphia plumbing code 2004 - note: see administrative amended permit #718714 for material change from cast iron for the drain, waste, vent and storm drainage to schedule pvc per standard astm d2665 and pvc drainage pattern fittings per standard astm d2466 Date: March 21, 2016 Contractor: Burnsies Plumbing And MechanicalPermit type: Plumbing permit | Permit status: Completed | Completion date: December 22, 2016 | Permit id: 665200 | |||||
For the relocation of lot lines to create (6) lots from ( lots. For the erection of (6), three story structures, to contain three dwelling units from the cellar-third floor, with roof deck and pilot house(to contain stairs and landing only) as per plans. Date: February 12, 2015Client: North 7th Residences Llc | Permit type: Zoning permit | Permit status: Completed | Completion date: February 12, 2015 | Permit id: 589639 | |||||
For the erection of an attached structure with roof deck at second floor level for a two(2) -family household living from second floor thru fourth floors and vacant commercial space at first floor (use registration permit required prior to occupancy). Size and location as shown in the application. Date: November 15, 2017Client: Levi Netanel Levy Shimon | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 15, 2017 | Permit id: 780456 | |||||
For the erection of an attached three story structure (maximum height nte 34 feet), with roof deck above accessed by a pilot house, with a rear deck on the second floor, for use as three(3) dwelling units. (as per proviso plan stamped by zoning board of adjustment on 1 21 15) Date: March 31, 2015Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 31, 2015 | Permit id: 599161 | |||||
SCORE 99 For erection of one three story structure to contain three dwelling units with projecting bay 2nd-3rd flr roof decks with pilot house to contain stairs and landing as per plans. (see ap #600383 for plans) Date: June 18, 2015 Contractor: Carmel Developments IncPermit type: New construction permit | Permit status: Completed | Completion date: December 27, 2016 | Permit id: 617129 | |||||
SCORE 89 New 2" fire service. New pipe, hangers, and fittings. New city approved backflow prevention assembly,new fire department connection. Sprinklers system throughout building in accordance with nfpa 13r. See a p 648668 for plan Date: December 2, 2015 Contractor: Aqueduct Fire ProtectionPermit type: Suppression permit | Permit status: Completed | Completion date: December 22, 2016 | Permit id: 654572 | |||||
SCORE 93 Plumbing construction throughout for a new (3)story (3)family dwelling including the 5" sanitary lateral & (3)3 4" water distribution lines - installation per the approved plans and the philadelphia plumbing code 2004 - note: see administrative amended permit #718715 for material change from cast iron for the drain, waste, vent and storm drainage to schedule pvc per standard astm d2665 and pvc drainage pattern fittings per standard astm d2466 Date: March 21, 2016 Contractor: Burnsies Plumbing And MechanicalPermit type: Plumbing permit | Permit status: Completed | Completion date: December 22, 2016 | Permit id: 665204 | |||||
SCORE 100 Install 300amp service and wire throughout as per nec 2008 east district install new fire alarm system Date: September 9, 2015 Contractor: Dameon CartyPermit type: Electrical permit | Permit status: Completed | Completion date: March 16, 2016 | Permit id: 627448 | |||||
SCORE 100 Installation of 300amp service complete with meters,panels & grounding wire throughout switches, recepts, lights, smoke co detectors, phone & cable as per 2008 new (east district). Install fire alarm throughout as per nfpa72 Date: July 20, 2016 Contractor: Dameon CartyPermit type: Electrical permit | Permit status: Completed | Completion date: December 27, 2016 | Permit id: 701812 | |||||
SCORE 100 Install (3) heat pump systems with ductwork. (multi-family) Date: September 16, 2016 Contractor: Fresh Air Services IncPermit type: Mechanical permit | Permit status: Completed | Completion date: December 22, 2016 | Permit id: 704352 | |||||
SCORE 82 Amend existing plumbing permit #665204 to show the drain, waste, vent and storm drainage material change from the approved cast iron to schedule pvc per standard astm d2665 and pvc drainage pattern fittings per standard astm d2466 Date: August 30, 2016 Contractor: Burnsies Plumbing LlcPermit type: Administrative permit | Permit status: Completed | Completion date: September 26, 2016 | Permit id: 718715 | |||||
Mechanical permit Date: September 16, 2016Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 704345 | |||||
Electrical permit Date: September 9, 2015Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 627448 | |||||
Administrative permit Date: August 30, 2016Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 718714 | |||||
Zoning use permit Date: March 31, 2015Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 599160 | |||||
Plumbing permit Date: March 21, 2016Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 665200 | |||||
New construction permit Date: June 18, 2015Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 617128 | |||||
Suppression permit Date: December 2, 2015Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 654571 | |||||
Electrical permit Date: July 20, 2016Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 701811 | |||||
Suppression permit Date: December 2, 2015Client: Rb3 Thompson Llc | Permit status: Active | Permit id: 654572 | |||||
Administrative permit Date: August 30, 2016Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 718715 | |||||
Zoning/use permit Date: March 31, 2015Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 599161 | |||||
New construction permit Date: June 18, 2015Client: Rb3 Thompson Llc | Permit status: Active | Permit id: 617129 | |||||
Plumbing permit Date: March 21, 2016Client: Rb3 Thompson Llc | Permit status: Active | Permit id: 665204 | |||||
Electrical permit Date: July 20, 2016Client: Rb3 Thompson Llc | Permit status: Active | Permit id: 701812 | |||||
Mechanical permit Date: September 16, 2016Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 704352 | |||||
Zoning/use permit Date: March 31, 2015Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 599160 | |||||
Electrical permit Date: July 20, 2016Client: Rb3 Thompson Llc | Permit status: Active | Permit id: 701811 | |||||
Mechanical permit Date: September 16, 2016Client: Rb3 Thompson Llc | Permit status: Active | Permit id: 704345 | |||||
New construction permit Date: June 18, 2015Client: Rb3 Thompson Llc | Permit status: Active | Permit id: 617128 | |||||
Electrical permit Date: September 9, 2015Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 627448 | |||||
Administrative permit Date: August 30, 2016Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 718714 | |||||
Plumbing permit Date: March 21, 2016Client: Rb3 Thompson Llc | Permit status: Active | Permit id: 665200 | |||||
Suppression permit Date: December 2, 2015Client: Rb3 Thompson Llc | Permit status: Active | Permit id: 654571 | |||||
Plumbing permit Date: March 21, 2016Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 665204 | |||||
Administrative permit Date: August 30, 2016Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 718715 | |||||
New construction permit Date: June 18, 2015Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 617129 | |||||
Suppression permit Date: December 2, 2015Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 654572 | |||||
Zoning use permit Date: March 31, 2015Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 599161 | |||||
Electrical permit Date: July 20, 2016Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 701812 | |||||
Mechanical permit Date: September 16, 2016Client: Rb3 Thompson Llc | Permit status: Completed | Permit id: 704352 |