ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 99 2 single phase 20-amp circuits. Permit needed. Receptacle is a single above the microwave in the cabinet if its a space saver. Then another in the space for the dishwasher in its space and provide a 6 so cord with a male end to plug it in. The breaker for the dishwasher will need a small breaker lock in the panel. Permit type: Permit - electric wiring | Permit id: 100693891 |