ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
2400sf re-roof for existing sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material tile proposed roofing material relay existing tile manufacturer brand and model color (if cool roof required) built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) added radiant barrier required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: January 26, 2016 Value: $14,232Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 28, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 99 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: November 13, 2015 Contractor: M N Mauzy Mechanical IncPermit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2015-Resalt- | |||||
SCORE 84 2400sf re-roof for existing sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material tile proposed roofing material relay existing tile manufacturer brand and model color (if cool roof required) built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) added radiant barrier required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 28, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: January 26, 2016Permit status: Pass | Permit id: Pds2016-Resalt- |