Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing 2. 88 kw photovoltaic system on roof Date: March 24, 2016 Contractor: A And R Solar Permit type: Electrical | Permit status: Permit closed | Completion date: May 10, 2016 | Expiration date: March 24, 2017 | Current use: Single family / duplex | Permit id: 6525833 | |||||
SCORE 99 2 amp service 3 28 06 cw - about to expire letter sent. Date: May 10, 2005 Contractor: Power House Electric Permit type: Electrical | Permit status: Permit finaled | Completion date: April 14, 2006 | Expiration date: May 10, 2006 | Current use: Single family / duplex | Permit id: 6057484 |