ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 93 Roof mount residential solar pv with 225a panel upgrade for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 11, 2015 Contractor: Leo BautistaPermit type: Electrical : 8003 - | Permit status: Permit issued | Permit id: Pds2015-Resalt- | |||||
SCORE 89 Roof mount residential solar pv with 225a panel upgrade for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 11, 2015 Contractor: Smart Energy Solar IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: January 25, 2016 | Permit id: Pds2015-Resalt- | |||||
Final Date: January 22, 2016Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Rough electric Date: September 23, 2015Permit status: Cancel | Permit id: Pds2015-Resalt- | |||||
SCORE 89 Roof mount residential solar pv with 225a panel upgrade for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 11, 2015 Contractor: Smart Energy Solar IncPermit type: Residential alterati | Permit status: Issued | Permit id: Pds2015-Resalt- | Parcel: 375-113-13-00 |