Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: December 6, 2016 Contractor: Gabriel Carini Heating And Air Conditioning Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: February 21, 2017 Contractor: Sullivan Solar Power Of California Inc Permit type: Addn | Permit status: Completed | Completion date: February 27, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: February 23, 2017 Permit status: Pass | Permit id: Pds2017-Resalt- | |||||
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: December 6, 2016 Contractor: Gabriel Carini Heating And Air Conditioning Inc Permit type: Mechanical - hvac change out | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: February 21, 2017 Contractor: Sullivan Solar Power Of California Inc Permit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2017-Resalt- |