ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Plumbing permit Date: September 30, 2015Permit status: Completed | Permit id: 641765 | |||||
Electrical permit Date: December 2, 2015Permit status: Completed | Permit id: 645426 | |||||
Zoning/use permit Date: March 4, 2015Permit status: Revoked | Permit id: 588829 | |||||
Mechanical permit Date: August 31, 2015Permit status: Completed | Permit id: 635529 | |||||
Administrative permit Date: January 28, 2016Permit status: Completed | Permit id: 666288 | |||||
Suppression permit Date: December 8, 2015Permit status: Completed | Permit id: 643448 | |||||
Administrative permit Date: December 3, 2015Permit status: Completed | Permit id: 646108 | |||||
Addition permit Date: August 10, 2015Permit status: Completed | Permit id: 594235 | |||||
Permit for the erection of an addition on the second and third floor level with a roof deck over the second story portion of an existing attached structure. Structure for use as a business and professional office throughout. Size and location as shown per application/plan. Date: May 6, 2015Applicant: Jordan A. Rushie | Permit type: Appeal | Permit status: Granted | Completion date: July 9, 2015 | Permit id: 25111 | |||||
Electrical permit Date: December 2, 2015Permit status: Completed | Permit id: 645426 | |||||
Plumbing permit Date: September 9, 2015Permit status: Completed | Permit id: 630459 | |||||
Zoning use permit Date: July 15, 2015Permit status: Completed | Permit id: 599801 | |||||
Addition permit Date: August 10, 2015Permit status: Completed | Permit id: 594235 | |||||
Mechanical permit Date: August 31, 2015Permit status: Completed | Permit id: 635529 | |||||
Administrative permit Date: December 3, 2015Permit status: Completed | Permit id: 646108 | |||||
Suppression permit Date: December 8, 2015Permit status: Completed | Permit id: 643448 | |||||
Administrative permit Date: January 28, 2016Permit status: Completed | Permit id: 666288 | |||||
Permit for the erection of an addition on the second and third floor level with a roof deck over the second story portion of an existing attached structure. Structure for use as a business and professional office throughout. Size and location as shown per application plan. Date: May 6, 2015Applicant: Jordan A. Rushie | Permit type: Appeal | Permit status: Granted | Completion date: July 9, 2015 | Permit id: 25111 | |||||
SCORE 100 Replacement of 1-100k btu rtu complete with new ductwork 5 ton ac unit onto existing curb and installation of 1-2. 5 ton mini split system heat pump Date: August 31, 2015 Contractor: Ss Mechanicals HvacPermit type: Mechanical permit | Permit status: Completed | Completion date: February 3, 2016 | Permit id: 635529 | |||||
For the erection of a two story addition on the second floor level and a roof deck on top of the second story portion of an existing attached building. Size and location as shown per application plans. Structure for use as a business and professional office on the first through third floor level. Date: July 15, 2015Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 15, 2015 | Permit id: 599801 | |||||
SCORE 100 Replace drain from building to curb trap and fresh air inlet & lateral pa20152672391 self certification no longer accepted all trenches in excess of 5 ft must have approved shoring at the time of inspection. Date: September 30, 2015 Contractor: B. M. Consulting Services IncPermit type: Plumbing permit | Permit status: Completed | Completion date: November 24, 2015 | Permit id: 641765 | |||||
SCORE 100 Interior plumbing construction throughout for alterations addition to a two-story attached structure used for business professional offices to a point 5-0" outside only - note: fuel gas and hvac equipment require separate permit(s) Date: September 9, 2015 Contractor: B. M. Consulting Services IncPermit type: Plumbing permit | Permit status: Completed | Completion date: February 3, 2016 | Permit id: 630459 | |||||
For the removal of interior and roof structural framing, and the installation of new 2nd floor addition to include new joist and rafter installations, new interior bearing wall installation, accessible restroom, interior stair installation, roof deck installation, new exterior fenestrations, service counter installation, and new wall floor ceiling finishing. (iebc 2009, compliance path: change in occupancy classification: lesser or equal hazard) separate permits required for electrical, plumbing and mechanical alterations. Separate permits required for documentation of special inspector retained for welding. Date: August 10, 2015Permit type: Addition permit | Permit status: Completed | Completion date: January 28, 2016 | Permit id: 594235 | |||||
SCORE 100 For the installation of a fire suppression system in accordance with nfpa 2007, standard 13, with a 2-in diameter backflow prevention assembly and service line. Date: December 8, 2015 Contractor: B. M. Consulting Services IncPermit type: Suppression permit | Permit status: Completed | Completion date: February 3, 2016 | Permit id: 643448 | |||||
SCORE 100 Install devices,wiring and lighting fixtures per 2008 nec (office space)east district Date: December 2, 2015 Contractor: Lohwasser RichardPermit type: Electrical permit | Permit status: Completed | Completion date: September 7, 2016 | Permit id: 645426 | |||||
For amendment to ap#594235 to document sprinkler installation in proposed erection under ap#643448. Date: January 28, 2016Permit type: Administrative permit | Permit status: Completed | Completion date: February 3, 2016 | Permit id: 666288 |