Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington used mh ![]() Permit status: Closed | Permit id: 10-06618 | |||||
SCORE 95 Wellington used mh Client: Wellington Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-06618 | Parcel: 6066 | |||||
SCORE 100 Wellington used mh Client: Wellington Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-06618 | Parcel: 6066 | |||||
SCORE 100 Wellington used mh Client: Wellington Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-06618 | Parcel: 6066 | |||||
SCORE 100 Wellington used mh Client: Wellington Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-06618 | Parcel: 6066 | |||||
November 18, 20 12:53:19 pm kneel. Wellington used mh to lot, reference master approval with fees 09-6160, owes 78 for me permit. Location: airport rd to wellington mh park.; december 16, 20 8:21:57 am kneel. Mh setup stated they were not the pl contractor, permit on hold until some one is listed.; december 22, 20 10:17:09 am jfortner. Premise #redacted phone number7; december 29, 20 4:05:55 pm kneel. Wellington used mh to lot; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are Permit type: Permits - historical | Permit status: Closed | Permit id: 10-06618 | Parcel: 6066 | |||||
Wellington used mh ![]() ![]() Permit type: Historical | Permit status: Closed | Permit id: 10-06618 | |||||
SCORE 100 Wellington used mh Client: Wellington Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-06618 | Parcel: 6066 | |||||
SCORE 95 Wellington used mh Client: Wellington Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-06618 | Parcel: 6066 | |||||
November 18, 20 12:53:19 pm kneel. Wellington used mh to lot, reference master approval with fees 09-6160, owes 78 for me permit. Location: airport rd to wellington mh park.; december 16, 20 8:21:57 am kneel. Mh setup stated they were not the pl contractor, permit on hold until some one is listed.; december 22, 20 10:17:09 am jfortner. Premise #redacted phone number7; december 29, 20 4:05:55 pm kneel. Wellington used mh to lot; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are ![]() Permit type: Permits - historical | Permit status: Closed | Permit id: 10-06618 | Parcel: 6066 |