ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
14 sf hra re-roof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material: clay tile proposed roofing material: clay tile manufacturer: u. S. Tile brand and model: u. S. Tile color (if cool roof required): terra-cotta built-up roofing assembly system number per attached listing report (if applicable): re-felting roof - (2) new layers 40# felt below re-installed existing tile specific exemption from cool roof requirements (if applicable): 50% or less of roo re-installed required building inspector field verification (if applicable): less than 50% of roof re-installed note: self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: March 2, 2015 Value: $8,302Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: May 1, 2015 | Permit id: Pds2015-Resalt- | |||||
Hvac changeout Date: November 1, 2010Permit type: Mechanical : 80 - ac | Permit status: Permit finaled | Completion date: December 10, 2010 | Permit id: Pds2010-1009-20 | |||||
14 sf re-roof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material clay tile proposed roofing material clay tile manufacturer u. S. Tile brand and model u. S. Tile color (if cool roof required) terra-cotta built-up roofing assembly system number per attached listing report (if applicable) re-felting roof -> (2) new layers 40# felt below re-installed existing tile specific exemption from cool roof requirements (if applicable) 50% or less of roo re-installed required building inspector field verification (if applicable) less than 50% of roof re-installed note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: March 2, 2015 Value: $8,302Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 1, 2015 | Permit id: Pds2015-Resalt- | |||||
1600sf partial re-tile/re-roof for existing sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material tile proposed roofing material tile manufacturer us clay one piece brand and model one piece color (if cool roof required) terra cotta built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) doing less than 50% of roof required building inspector field verification (if applicable) no certification required note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: August 26, 2015 Value: $9,488Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 12, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 100 Hvac changeout Date: November 1, 2010 Contractor: Excel Air CorpPermit type: Residential alteration-addn | Permit status: Completed | Completion date: December 10, 2010 | Permit id: Pds2010-1009-20 | |||||
SCORE 96 14 sf re-roof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material clay tile proposed roofing material clay tile manufacturer u. S. Tile brand and model u. S. Tile color (if cool roof required) terra-cotta built-up roofing assembly system number per attached listing report (if applicable) re-felting roof -> (2) new layers 40# felt below re-installed existing tile specific exemption from cool roof requirements (if applicable) 50% or less of roo re-installed required building inspector field verification (if applicable) less than 50% of roof re-installed note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 1, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Date: October 8, 2015Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Date: December 2, 2010Permit status: Pass | Permit id: Pds2010-1009-20 |